HomeMy WebLinkAbout0116547-Building
0
OSHKOSH
ON THE WATER
Job Address 420 JACKSON ST
CITY OF OSHKOSH
No
116547
BUILDING PERMIT. APPLICATION AND RECORD
OWner CITY OF OSHKOSH
Create Date
09/29/2005
Designer
Contractor
FLUOR BROS CONSTRUCTION CO
Category
262 - City of Oshkosh-Alteration
Plan
Type
. Buiiding
0 Si9n
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ------2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ------2 Sq. Ft. Bedrooms Stories
Garage ------2 Sq. Ft. Baths 0
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature
ofWork
ITY OF OSHKOSH / RENOVATiON OF POLICE DEPARTMENT PER PLANS/SPECiFiCATiONS
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$597,000.00 Plan Approval
$0.00 Permit Fee Paid
$0.00 Park Dedication
$0.00
Issued By:
Date 09/29/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 0701340000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature C::¡;Õ ~
Agent/Owner
Address 2030TTERAVE OSHKOSH
Date o9-z9-D5
WI 54901 - 0000
Telephone Number
231-6260
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (I.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.