Loading...
HomeMy WebLinkAbout0116507 H .e OSHKOSH ON THE WATER Job Address 734 MONROE ST CITY OF OSHKOSH No 116507 HVAC PERMIT - APPLICATION AND RECORD Owner PAUL D GREENINGER Create Date 09/28/2005 Category 502. Residential.Both 1"'1 Eiectrlc Plan Contractor PREMiUM AIR INC 1"'1 Gas 1 10ii Fuel System 0 New ~ Forced Air U Radiant I 1 Electric 1 I HotWater Chimney Type r) Chimney A () Chimney B Heat Loss r ) As Approved . Existing BTU Rate r ) As Per Plan ( ) Variable ~~-_--.J U Steam 1 I Suppl. I 1 Solid 1 n Other .--------.J ~ AlC 1 U Vent 1 1 I Con. Burner 1 1 1 Solar . DirectVent ( ) Not Applicable () Not Applicable . Other Value Value 60000 2T 12 Seer Use/Nature fSFRI Replace furnace and AlC. EIV provided by Premium Air. NO CHINMNEY LINER BEING INSTALLEDWhere an appliance is of Work permanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in he interior of the CN and to provide the appliance or appliances served with the req. draft. $5,448.00 Plan Approval $0.00 Permit Fee Paid $87.50 Fees: Valuation Issued By: Date 09/28/2005 0 Permit Voided I Parcelld # 1107580000 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenVOwner Address N3225 HWY 15 HORTONVILLE WI 54944.0 Telephone Number 920.982.3323 To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.