HomeMy WebLinkAbout0116507 H
.e
OSHKOSH
ON THE WATER
Job Address 734 MONROE ST
CITY OF OSHKOSH
No
116507
HVAC PERMIT - APPLICATION AND RECORD
Owner
PAUL D GREENINGER
Create Date 09/28/2005
Category 502. Residential.Both
1"'1 Eiectrlc
Plan
Contractor PREMiUM AIR INC
1"'1 Gas 1 10ii
Fuel
System 0 New
~ Forced Air U Radiant
I 1 Electric 1 I HotWater
Chimney Type r) Chimney A () Chimney B
Heat Loss r ) As Approved . Existing
BTU Rate r ) As Per Plan ( ) Variable
~~-_--.J
U Steam
1 I Suppl.
I 1 Solid 1
n Other .--------.J
~ AlC 1 U Vent 1
1 I Con. Burner 1
1 1 Solar
. DirectVent
( ) Not Applicable
() Not Applicable
. Other
Value
Value 60000 2T 12 Seer
Use/Nature fSFRI Replace furnace and AlC. EIV provided by Premium Air. NO CHINMNEY LINER BEING INSTALLEDWhere an appliance is
of Work permanently disconnected from an existing chimney or vent (CN), the CN shall be resized as necessary to control flue gas condensation in
he interior of the CN and to provide the appliance or appliances served with the req. draft.
$5,448.00
Plan Approval
$0.00
Permit Fee Paid
$87.50
Fees: Valuation
Issued By:
Date 09/28/2005
0 Permit Voided I
Parcelld # 1107580000
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
AgenVOwner
Address
N3225 HWY 15
HORTONVILLE
WI 54944.0
Telephone Number
920.982.3323
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.