Loading...
HomeMy WebLinkAbout0116490-Building (roof) e OSHKOSH ON THE WATER Job Address 215 E GRUENWALD AVE CITY OF OSHKOSH No 116490 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS A/BARBAR KAUFMANN Create Date 09/28/2005 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -..-----J! Sq. Ft. -..-----J! Sq. Ft. Rooms Height 0 Ft. D Projection i Canopies Finished/Living Bedrooms Stories Garage -..-----J! Sq. Ft. Baths Signs Foundation . Poured Concrete 0 Fioating Siab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Park Dedication Not Required # Dwelling Units -----i> # Structures -----i> Use/Nature ofWork FR/ Tear-off roofing (South side shingie area only) repiace damaged decking. and instail new shingies. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $789.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 09/28/2005 Final/O.P. 00/00/0000 D Permit Voided [ Parcelld # 1503470000 In the performance of this work I agree to perform ail work pursuant to ruies governing the described construction. Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST AgenUOwner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.