HomeMy WebLinkAbout0116490-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 215 E GRUENWALD AVE
CITY OF OSHKOSH
No
116490
BUILDING PERMIT - APPLICATION AND RECORD
Owner THOMAS A/BARBAR KAUFMANN
Create Date
09/28/2005
Designer
Contractor
HICKEY ROOFING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-..-----J! Sq. Ft.
-..-----J! Sq. Ft.
Rooms
Height
0 Ft.
D Projection i
Canopies
Finished/Living
Bedrooms
Stories
Garage
-..-----J! Sq. Ft.
Baths
Signs
Foundation
. Poured Concrete 0 Fioating Siab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units -----i>
# Structures
-----i>
Use/Nature
ofWork
FR/ Tear-off roofing (South side shingie area only) repiace damaged decking. and instail new shingies.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$789.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Issued By:
Date 09/28/2005
Final/O.P. 00/00/0000
D Permit Voided [
Parcelld # 1503470000
In the performance of this work I agree to perform ail work pursuant to ruies governing the described construction.
Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1427 BROAD ST
AgenUOwner
OSHKOSH
WI 54901 - 0000
Telephone Number
426-4008
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.