HomeMy WebLinkAbout0116495-Building (windows)
e
OSHKOSH
ON THE WATER
Job Address 807 FRANKLIN ST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116495
Owner WILLIAM D/JAYMI SNOW JR
Create Date
09/28/2005
Designer
Contractor
WINDOW WORLD OF MILWAUKEE
Category
141 - Exterior Remodeiing
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
D Projection:
Canopies
Finished/Living
Bedrooms 0
Stories
Garage
~Sq.Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Park Dedication
Not Required
# Dwelling Units ---2
# Structures
0
Use/Nature SFRIlnstallation of 5 vinyl replacement windows in existing openings - NO STRUCTURAL WORK
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$1,900.00 Plan Approval
$0.00 Permit Fee Paid
$26.00 Park Dedication
$0.00
Issued By:
Date 09/28/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1006100000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which It is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 625 FOND DU LAC AVE
Agent/Owner
FOND DU LAC
WI 54935 - 0000
Telephone Number
920-923-4189
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.