HomeMy WebLinkAbout0116493-Building (kitchen)
~
OSHKOSH
ON THE WATER
Job Address 861 ECKARDT CT
CITY OF OSHKOSH
No
116493
BUILDING PERMIT - APPLICATION AND RECORD
OWner WilLIAM R WilDE/BARBARA ROHLF
Create Date
09/28/2005
Designer
Contractor
TOM WilLIAMS BUilDING CONTRACTOR
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~ Sq. Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies
Garage
~Sq.Ft.
Baths
0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units --9.
# Structures
--9.
Use/Nature SFRI Kitchen remodel- Installing new cabinets. countertops, and flooring. No walls will be opened.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$10,000.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Date 09/28/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1413000000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ap rovals before starting such activity.
Dat~ '7- eY' -t>5'
Agent/Owner
Signature
Address 861 ECKARDT CT
OSHKOSH
WI 54902 - 6732
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.