Loading...
HomeMy WebLinkAbout2005-Plumbing (laterals) ~ OSHKOSH ON THE WATER Job Address 1095ZACHERDR CITY OF OSHKOSH PLUMBING PERMIT - APPLICATION AND RECORD Owner JOHN EfTHERESA STROUS Category 401 - Residential-Exterior (laterals) 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 0 BeerTap 0 Hand Sink 0 Urinal 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 0 DipWell 0 F Prep Sink 0 Gar Drain 0 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 No 116483 Create Date 09/27/2005 Contractor VAN HANDEL, TOM CORP Bathtub 0 Shower Whirlpool 0 Floor Drain Lavatory 0 Lndry Tray Toilet 0 Disposal Res, Sink 0 Dishwasher Bar Sink 0 Sump Pump Water Heater 0 Classrm Sink Site Drain 0 Breakrm Sink Roof Drain 0 Ejector/Grind Misc. 0 Fixtures Use/Nature r"" of Work Plan Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Sanitary Sewer Storm Sewer Size 4" Material Plastic Type Lateral # Conn. Type 1 New 0 0 0 0 New 4" Plastic Lateral Water Service 11/2 Plastic Lateral New Parcelld # 1560104500 Valuation $1,500.00 $0.00 $150.00 D Permit Voided I Plan Approval Issued By Penmit Fees Date 09/27/2005 In the perfonmanee of this work, I agree to perfonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform tI1e work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 920-735-1221 Address 1830 E EDGEWOOD DR AgenUOwner APPLETON WI 54913 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.