Loading...
HomeMy WebLinkAbout2005-HVAC ~ OSHKOSH ON THE WATER Job Address 2059-2087 WITZEL AVE CITY OF OSHKOSH HVAC PERMIT - APPLICATION AND RECORD No 117050 Owner WITZEL ST RETAIL LLC Create Date 09/20/2005 Plan 02-74-0905 Contractor CENTRAL HEATING SERVICE INC Fuel l"'i Gas I I Oil System ~ New ~ Forced Air U Radiant I I Electric I I Hot Water Chimney Type K) Chimney A e ) Chimney B Heat Loss . As Approved e ) Existing BTU Rate . As Per Plan e ) Variable Category 512 -Ind. & Comm-Both l"'i Electric I I Solar I I Solid n Replace U Steam I I Suppl. e) DirectVent n Other ~ AlC I I I Can. Burner I . Not Applicable U Vent e ) Not Applicable e) Otl1er Value Value Use/Nature f'\dd RTU and modify distribution ductwork in Prep Kitchen of Banquet Room to make the banquet room comply with the Separately of Work Ventilated Smoking Room requirements Fees: Valuation $5.100.00 Plan Approval $0.00 Penmit Fee Paid $81.50 Issued By: Date 11/01/2005 D Penmit Voided I Parcelld # 0616030100 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While tI1e City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perfonm the work described in this permit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Agent/Owner Address 1565 HARRISON STREET OSHKOSH WI 54901-0 Telephone Number (920) 235-6670 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perfonmed within two business days from the time the project is ready. ~ OJHKOJH City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 www.cì.oshkosh.wì.us ON THE WATER September 27, 2005 Dale H O'Connell T.S.L 2200 So Fishland Ave Green Bay WI 54304 Kodiak Jack's 2059 Witzel Ave Oshkosh, WI 54904 Witzel St Retail Inc 601 A Oregon St Oshkosh, WI 54902-5965 Site: Kodiak Jack's 2059 Witzel Ave Oshkosh WI 54904 For: Description: HVAC Alterations for Smoking Room Object Type: HV AC only Class of Construction: nIB - 3760 Sq Ft.; SprinkIered Occupancy: A: Assembly Plan Number: Q2- 74-0905 The submittal described above bas been reviewed for confonmance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as derIDed in Chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements Key Item(s) I Conditions: The owner is advised to consult with the Health Services Division to determine the extent of food service that is allowed in the separately ventilated smoking room. The owner is reminded that the separately ventilated smoking room must be separated from the adjoining rooms with walls of solid construction. Any doors in these walls must be of solid construction, self closing, and gasketed. A building permit shall be obtained prior to installing any walls or doors. The folding doors shown on the HVACplans would not appear to comply with this requirement. mc 711.3 Any penetrations of fire rated assemblies are required to be protected with a listed firestopping system that matches the rating of the wall assembly being penetrated. Copies of the firestopping systems are required to be provided at the time ofinspection. IMC 302.1 The building or structure shall not be weakened by the installation of mechanical systems. Verify that existing structure is capable of supporting the additional weight of the proposed rooftop equipment. IMC 304.9 Guards. Guards shall be provided where appliances, equipment, fans or other components that require service are located within 10 feet (3048 mm) of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches (762 mm) above the floor, roof or grade below. The guard shall extend not less than 30 inches (762 mm) beyond each end of such appliance, equipment, fan or component and the top of the guard shall be located not less than 42 inches (1067 mm) above the elevated surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch- diameter (533 mm) sphere and shall comply with the loading requirements for guards specified in the International Building Code. fhbri",m'200j Comm Plan Rev,ow"Q2-74-ŒX)5 2059 Wii,d Ave HVAC Only.doc Page 1 of2 IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment and appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet (4877 mm), such access shall be provided by a permanent approved means of access, the extent of which shall be ITom grade or floor level to the equipment and appliances' level service space. Such access shall not require climbing over obstructions greater than 30 inches (762 mm) high or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal (33-percent slope). IMC 401.5.1 Mechanical and gravity outside air intake openings shall be located a minimum of 10 feet ITom any hazardous or noxIOus contaminant such as vents, chimneys, plumbing vents, streets, alleys, parking lots and loading docks. IECC 803.3.3.3 Off-hour controls. Each zone shall be provided with thermostatic setback controls being allowed. that are controlled by either an automatic time clock or programmable control system. Comm 61.31(4) Revisions to approved plans. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. All revisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with Comm 61.31(1). MUN 30-35 (1)(5) All rooftop and ground level mechanical equipment and utilities shall be fully screened ITom view of any street or residential zoning district. Contact David Buck - Associate planner (920) 236- 5062 for additional information on screening requirements. All screening shall be properly anchored in place to resist wind loads. Additionally mc 1608.8 Roofprojections - Drift loads due to mechanical equipment, penthouses, parapets and other projections above the roof shall be determined in accordance with Section 7.8 of ASCE 7. SUBMIT: IECC 503.3.3.7 [Comm 63.0503(2)(t)) Balancing and documentation of the HV AC system shall conform to the !MC. Balancing report required to be submitted prior to final occupancy being allowed. A summary shall be provided with the balancing report demonstrating that the separately ventilated smoking room has negative pressure in relation to the adjacent prep kitchen and adjoining bar . Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professional shall file a compliance statement form SBD-9720 with this office. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compiiance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. cc: Property file Fee Required $ Fee Received $ Balance Due $ 300.00 300.00 0.00 rhb,i"nn'20Ü5 Comm Plan Re,iew".Q1-74-O905 2059 WÜ"I Ave nVAC Only.d"" Page 2 of2 ~ OJHi<OfH ON THE WATER City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 www.ci.oshkosh.wi.us November 28, 2005 Dale H O'Connell T.S.I. 2200 So FishlandAve Green Bay WI 54304 Witzel St Retail Inc 601 A Oregon St Oshkosh, WI 54902-5965 Site: Kodiak Jack's 2059 Witzel Ave Oshkosh WI 54904 For: Description: Revised HV AC Alterations for Smoking Room Dated 11/14/05 Object Type: HV AC only Class of Constrnction: 11m - 3760 Sq Ft.; SprinkIered Occupancy: A: Assembly Plan Number: Q2-74-0905-2 The submittal described above has been reviewed for confonmance with applicable Wisconsin Administrative Codes and Wisconsin Statutes. The submittal has been CONDITIONALLY APPROVED. The owner, as defined in Chapter 101.01(10), Wisconsin Statutes, is responsible for compliance with all code requirements Key Item(s) I Conditions: The owner is advised to consult with the Health Services Division to determine the extent of food service that is allowed in the separately ventilated smoking room. The owner is reminded that the separately ventilated smoking room must be separated from the adjoining rooms with walls of solid construction. Any doors in these walls must be of solid construction, self closing, and gasketed. A building permit shall be obtained prior to installing any walls or doors. Provide plans detailing the new door and glass system identified as item # 14 on plans. Construction of this new separation wall may require the relocation and/or addition of fire sprinkler heads. IBC 711.3 Any penetrations of fire rated assemblies are required to be protected with a listed firestopping system that matches the rating of the wall assembly being penetrated. Copies ofthefirestopping systems are required to be provided at the time ofinspection. IMC 302.1 The building or structure shall not be weakened by the installation of mechanical systems. Verify that existing structure is capable of supporting the additional weight of the proposed roof top equipment. H:\briann\2005 Comm Plan Review"Q2-74-0905-2 2059 Wi!zd Ave nVAC Only.don Page 1 of3 IMC 304.9 Guards. Guards shall be provided where appliances, equipment, fans or other components that require service are located within 10 feet (3048 rnm) of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches (762 rnm) above the floor, roof or grade below. The guard shall extend not less than 30 inches (762 rnm) beyond each end of such appliance, equipment, fan or component and the top of the guard shall be located not less than 42 inches (1067 rnm) above the elevated surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch- diameter (533 rnm) sphere and shall comply with the loading requirements for guards specified in the International Building Code. IMC 306.5 Equipment and appliances on roofs or elevated structures. Where equipment and appliances requiring access are installed on roofs or elevated structures at a height exceeding 16 feet (4877 rnm), such access shall be provided by a permanent approved means of access, the extent of which shall be from grade or floor level to the equipment and appliances' level service space. Such access shall not require climbing over obstructions greater than 30 inches (762 rnm) high or walking on roofs having a slope greater than 4 units vertical in 12 units horizontal (33-percent slope). IMC 401.5.1 Mechanical and gravity outside air intake openings shall be located a minimum of 10 feet from any hazardous or noxious contaminant such as vents, chimneys, plumbing vents, streets, alleys, parking lots and loading docks. IECC 803.3.3.3 Off-hour controls. Each zone shall be provided with thermostatic setback controls being allowed. that are controlled by either an automatic time clock or programmable control system. Comm 61.31(4) Revisions to approved plaus. All proposed revisions and modifications which involve rules under this code and which are made to construction documents that have previously been granted approval by the department or its authorized representative, shall be submitted to the office that granted the approval. All revisions and modifications to plans shall be approved in writing by the department or its authorized representative prior to the work involved in the revision or modification being carried out. A revision or modification to a plan, drawing or specification shall be signed and sealed in accordance with Cornm 61.31 (1). MUN 30-35 (1)(5) All rooftop and ground level mechanical equipment and utilities shall be fully screened from view of any street or residential zoning district. Contact David Buck - Associate planner (920) 236- 5062 for additional information on screening requirements. All screening shall be properly anchored in place to resist wind loads. Additionally mc 1608.8 Roofprojections - Drift loads due to mechanical equipment, penthouses, parapets and other proj ections above the roof shall be determined in accordance with Section 7.8 of ASCE 7. SUBMIT: IECC 503.3.3.7 [Comm 63.0503(2)(f)] Balancing and documentation of the HV AC system shall conform to the !MC. Balancing report required to be submitted prior to final occupancy being allowed. A summary shall be provided with the balancing report demonstrating that the separately ventilated smoking room has negative pressure in relation to the adjacent prep kitchen and adjoining bar . Comm 61.50 (4) Supervision. Prior to the initial occupancy of an alteration the supervising professioual shall file a compliance statement form SBD-9720 with this office. A copy of the approved plans, specifications, and this letter shall be on-site during construction. All permits are required to be obtained prior to commencement of work. n,\brirum'2Q05 Comm Plan Review"Q2-74-0905-2 2059 Witzel Ave ¡WAC Only.doc Page2of3 In granting this approval the City of Oshkosh Inspection Services Department reserves the right to require changes or additions should conditions arise making them necessary for code compliance. As per state stats 101.12(2), nothing in this review shall relieve the designer of the responsibility for designing a safe building, structure, or component. Inquiries concerning this correspondence may be made to me at the nmnber listed below or the address on this letterhead. ~Iy, ~ Building Systems Consultant (920) 236-5051 Monday- Friday 7:30 A.M. to 8:30 A.Mand 12:30 AM to 1:30 P.M. bnoe@cLoshkosh.wi.us. cc: Property file Fee Required $ Fee Received $ Balance Due $ 300.00 300.00 0.00 f1:\briann'2005 Corum Plan Rev;owi:Q2-74-0"05-2 2059 Witzel Ave nVAC Only.do, Page30f3