HomeMy WebLinkAbout0116481-Building (garage)
~
OSHKOSH
ON THE WATER
Job Address 13'39W BENT AVE
,
CITY OF OSHKOSH
No
116481
BUILDING PERMIT - APPLICATION AND RECORD
Owner CRAIG N KLEINSCHMIT
Create Date
09/27/2005
Designer
Contractor
OWNER
Category
149 - Raze detached garage, construct detached garage
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Size
Zoning
Unfinished/Basement
------.2 Sq. Ft.
------.2 Sq. Ft.
D Projection I
Finished/Living
Canopies ------.2
Garage
------.2 Sq. Ft.
Signs
------.2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
~
Park Dedication
Use/Nature SFRI Razing the detached garage and constructing a 20'x20' detached garage per the site plan submitted.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$9,200.00 Plan Approval
$0.00 Permit Fee Paid
$74.00 Park Dedication
$0.00
Issued By:
Date 09/27/2005
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld # 1202480000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder<s) and to secure WS approva befo~estartings",chactivity. ~/ ~ r-
Signature' Date ~ ~ '
Agent/Owner
Oshkosh WI 54901 - 0000 Telephone Number '1'.¡g '" ).3} CK:)'70
Address
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.