Loading...
HomeMy WebLinkAbout0116481-Building (garage) ~ OSHKOSH ON THE WATER Job Address 13'39W BENT AVE , CITY OF OSHKOSH No 116481 BUILDING PERMIT - APPLICATION AND RECORD Owner CRAIG N KLEINSCHMIT Create Date 09/27/2005 Designer Contractor OWNER Category 149 - Raze detached garage, construct detached garage Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ------.2 Sq. Ft. ------.2 Sq. Ft. D Projection I Finished/Living Canopies ------.2 Garage ------.2 Sq. Ft. Signs ------.2 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures ~ Park Dedication Use/Nature SFRI Razing the detached garage and constructing a 20'x20' detached garage per the site plan submitted. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $9,200.00 Plan Approval $0.00 Permit Fee Paid $74.00 Park Dedication $0.00 Issued By: Date 09/27/2005 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # 1202480000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder<s) and to secure WS approva befo~estartings",chactivity. ~/ ~ r- Signature' Date ~ ~ ' Agent/Owner Oshkosh WI 54901 - 0000 Telephone Number '1'.¡g '" ).3} CK:)'70 Address To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.