Loading...
HomeMy WebLinkAbout2005-Building (sprinkler) e OSHKOSH ON THE WATER Job Address 3001 S WASHBURN ST CITY OF OSHKOSH No 116453 BUILDING PERMIT - APPLICATION AND RECORD Owner FIRST HORIZON GROUP LIMITED PTNSHP Create Date 09/26/2005 Designer Paul Beringer Contractor AHERN FIRE PROTECTION Category 232 - Alteration Stores & Customer Service Plan P5-52-0705 Type . Building___~O Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ------" Sq- FI. ------" Sq. Ft. Rooms 0 Height Bedrooms Stories Baths 0 0 Ft D Projection Canopies ------" Finished/Living Garage ------" Sq- Ft- Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain No Height Permit Not Required Not Required # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature D190 & D200 "The Childrens Place" - Modification of existing automatic fire sprinkler system as per plans submitted- of Work HVAC Contractor Plumbing Contractor Electric Contractor $10.000-00 Plan Approval $0_00 Permit Fee Paid $74_00 Park Dedication $0-00 Fees: Valuation Issued By: Date 09/26/2005 Final/O_P- 00/00/0000 D Permit Voided I Parcelld # 1329420000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction- While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity- Signature Date Address 201 Morris Court AgenUOwner Fond du Lac WI 54936 - 0000 Telephone Number 920-921-9020 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.