HomeMy WebLinkAbout2005-Building (sprinkler)
e
OSHKOSH
ON THE WATER
Job Address 3001 S WASHBURN ST
CITY OF OSHKOSH
No
116453
BUILDING PERMIT - APPLICATION AND RECORD
Owner FIRST HORIZON GROUP LIMITED PTNSHP
Create Date
09/26/2005
Designer
Paul Beringer
Contractor
AHERN FIRE PROTECTION
Category
232 - Alteration Stores & Customer Service
Plan P5-52-0705
Type
. Building___~O Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
------" Sq- FI.
------" Sq. Ft.
Rooms 0 Height
Bedrooms Stories
Baths 0
0 Ft
D Projection
Canopies ------"
Finished/Living
Garage
------" Sq- Ft-
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain No
Height Permit Not Required
Not Required
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature D190 & D200 "The Childrens Place" - Modification of existing automatic fire sprinkler system as per plans submitted-
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$10.000-00 Plan Approval
$0_00 Permit Fee Paid
$74_00 Park Dedication
$0-00
Fees: Valuation
Issued By:
Date 09/26/2005
Final/O_P- 00/00/0000
D Permit Voided I
Parcelld # 1329420000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction-
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity-
Signature
Date
Address 201 Morris Court
AgenUOwner
Fond du Lac
WI 54936 - 0000
Telephone Number
920-921-9020
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.