HomeMy WebLinkAbout0116459-Building (siding)
0
OSHKOSH
ON THE WATER
Job Address 1369RAHRAVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116459
Owner STEPHEN M BULLARD/K GREMMINGER
Create Date
09/26/2005
Designer
Contractor
SORENSON BUILDERS
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
_-.-J
Zoning
Size
Unfinished/Basement ~Sq.Ft. Rooms
Finished/Living ~Sq.Ft. Bedrooms
Garage ~Sq.Ft. Baths
Height
0 Ft.
0 Projection I
Stories
Canopies 0
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature SFR/ Installing cedar siding on the house and installing 18 replacement windows. The homeowner will be doing the electrical work and
of Work ill submit a EIV. If the EIV is not submitted an electrical permit will be required.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: val~
Issued By: ¡
$35.000.00 Plan Approval
$0.00 Permit Fee Paid
$169.00 Park Dedication
$0.00
Date 09/26/2005
Final/O.P. 00/00/0000
0 PennitVoided i
Parcelld # 0207070000
In the performance of this work I agree to perform all work pursuant to rules governing tI1e described construction.
While the City of Oshkosh has no 'ty to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit appll ion Jthïn an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure a ..~e /;ry approvals before starting such activity.
Signature Date ~s?f .-!~-
AgenUOwner
Address W10618 CEDAR RD
LARSEN
~ 54947 - 0000 Telephone Number
836-2889
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.