Loading...
HomeMy WebLinkAbout0116459-Building (siding) 0 OSHKOSH ON THE WATER Job Address 1369RAHRAVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116459 Owner STEPHEN M BULLARD/K GREMMINGER Create Date 09/26/2005 Designer Contractor SORENSON BUILDERS Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze _-.-J Zoning Size Unfinished/Basement ~Sq.Ft. Rooms Finished/Living ~Sq.Ft. Bedrooms Garage ~Sq.Ft. Baths Height 0 Ft. 0 Projection I Stories Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures 0 Park Dedication Use/Nature SFR/ Installing cedar siding on the house and installing 18 replacement windows. The homeowner will be doing the electrical work and of Work ill submit a EIV. If the EIV is not submitted an electrical permit will be required. HVAC Contractor Plumbing Contractor Electric Contractor Fees: val~ Issued By: ¡ $35.000.00 Plan Approval $0.00 Permit Fee Paid $169.00 Park Dedication $0.00 Date 09/26/2005 Final/O.P. 00/00/0000 0 PennitVoided i Parcelld # 0207070000 In the performance of this work I agree to perform all work pursuant to rules governing tI1e described construction. While the City of Oshkosh has no 'ty to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appll ion Jthïn an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure a ..~e /;ry approvals before starting such activity. Signature Date ~s?f .-!~- AgenUOwner Address W10618 CEDAR RD LARSEN ~ 54947 - 0000 Telephone Number 836-2889 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.