Loading...
HomeMy WebLinkAbout0116471-Plumbing (remodel) G CITY OF OSHKOSH No 116471 OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD ON THE WATER Job Address 906 E IRVING AVE Owner CHARLES E WilLIAMS Create Date 09/26/2005 Contractor JOHN E MEYER CO Category 410 - Residential-Interior Plan Bathtub 1 Shower 0 WaterSoftner 0 Wait St. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 1 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 1 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 1 Dishwasher 1 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures UselNature I"W-~' of Work Size Material Type # Conn. Type Sanitary Sewer Coffee Maker 0 Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Storm Sewer 0 0 0 0 0 Water Service Parcelld # 1105990000 $35.00 0 Permit Voided I Valuation , Issued B~ $4.000.00 Plan Approval $0.00 Permit Fees Date 09/26/2005 In the performance of this work. I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this penmit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2783 Agent/Owner OSHKOSH WI 54903 - 2783 Telephone Number 235-2300 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.