Loading...
HomeMy WebLinkAbout0116462-Building (siding/windows) e OSHKOSH ON THE WATER Job Address 123 W 24TH AVE CITY OF OSHKOSH No 116462 BUILDING PERMIT - APPLICATION AND RECORD Owner PETER A SCHNEIDER Create Date 09/26/2005 Designer Contractor DROESSLER CUSTOM HOMES Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths D Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature I fr / replace windows and doors, aluminum soffit and fascia, replacing wood siding with vinyl on house & garage, no structural changes' of Work EIV Droessler Elec HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $16,000.00 Plan Approval $0.00 Permit Fee Paid $104.00 Park Dedication $0.00 Issued By: Date 09/26/2005 Final/D.P. 00/00/0000 D Permit Voided I Parcelld # 1413370100 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work descrtbed in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approval~ore starting such actvity. Q- ~ L ~ Agent/Owner Çþ(6/Ós- Address 430 ZARLING AVE OSHKOSH WI 54901 - 0000 Telephone Number 232-3548 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.