HomeMy WebLinkAbout0116462-Building (siding/windows)
e
OSHKOSH
ON THE WATER
Job Address 123 W 24TH AVE
CITY OF OSHKOSH
No
116462
BUILDING PERMIT - APPLICATION AND RECORD
Owner PETER A SCHNEIDER
Create Date
09/26/2005
Designer
Contractor
DROESSLER CUSTOM HOMES
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Canst:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
D Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature I fr / replace windows and doors, aluminum soffit and fascia, replacing wood siding with vinyl on house & garage, no structural changes'
of Work EIV Droessler Elec
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$16,000.00 Plan Approval
$0.00 Permit Fee Paid
$104.00 Park Dedication
$0.00
Issued By:
Date 09/26/2005
Final/D.P. 00/00/0000
D Permit Voided I
Parcelld # 1413370100
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
descrtbed in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approval~ore starting such actvity.
Q- ~ L ~
Agent/Owner
Çþ(6/Ós-
Address 430 ZARLING AVE
OSHKOSH
WI 54901 - 0000
Telephone Number
232-3548
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.