HomeMy WebLinkAbout0116445-Plumbing (water heater)
0
OSHKOSH
ON THE WATER
Job Address 820 WISCONSIN ST
CITY OF OSHKOSH
No
116445
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor JOHN D RANSOM
0
0
0
0
0
0
1
0
0
0
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Create Date 09/23/2005
Plan
Owner TRI STAR INVESTMENTS LLC
Category 411 - Residential-Water Heaters
Bathtub
Whirlpool
Lavatory
Toilet
Res. Sink
Bar Sink
Water Heater
Site Drain
Roof Drain
Misc.
Fixtures
Use/Nature
of Work
Breakrm Sink
Ejector/Grind
a
0
0
0
a
0
0
0
a
Watersoftner
Local Waste
Clothes Wshr
Bidet
Beer Tap
Lab Sink
a
0
0
0
0
0
a
0
a
Waitst
Ice Chest
Exam Sink
sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0
0
0
0
a
a
0
0
0
Shamp Sink a
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
standp Rec a
Ice Maker 0
Gar Drain 0
Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ex! Grease Trap a
RPZ Valve 0
Eye Wash statn 0
Wtr Sewer Mtra 0
Deduct Meters a
Wtr Usage Mtra 0
Sterilizer
Dip Well
Drink Ftn
Duplex/Install gas water heater for Kitz & Pfeil' (debit acct)
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
a
0
Storm Sewer a
a
a
a
a
Water Service 0
0
0
0 Parcelld #
0 0501020000
Valuation .,4390.00
Issued By V
Plan Approval
$0.00
Permit Fees
$20.00 0 Permit Voidedj
Date 09/23/2005
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number
920-922-1987
Address W5056 PARADISE LN
AgenUOwner
FOND DU LAC
WI 54935 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.