Loading...
HomeMy WebLinkAbout2005-Building (shed) "~) OSHKOSH ON THE WATER Job Address 2240 ABBEY AVE CITY OF OSHKOSH No 116436 BUILDING PERMIT -APPLICATION AND RECORD Owner DARRELL L ROTHE Create Date 09/23/2005 Designer Contractor OWNER ..._~~----_.. --- Category 151 - New Utility Buildings-Sheds (Residential) Plan Type ._~uilding -~O Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Canst: Size Unfinished/Basement -----.2 Sq. Ft .0 Sq. Ft Rooms Height 0 Ft. 0 Projection! Finished/Living Bedrooms Stories Canopies Garage -----.2 Sq. Ft Baths 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature ofWork FRllñSfã"lïaíiõí1õr;¡-;¡ö'x1O' shed on a concrete slab. The shed will be anchored to resist wind uplift. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 09/23/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 0617060000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approval efore starting such activity. Signatur Date s,q -.;23 -¿:J!) , Agent/Owner OSHKOSH WI 54904 - 8078 Telephone Number Address 2240 ABBEY AVE To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready. \ ß t; Q) > <{ >- Q) .Q .Q <{ a """ C'I C'I I ¡ . ¡ . ~ . i * '" ~ ~ jj " " E ~ ~ ã . ~ ~ cHI nu ~ ~ ~ ~ ~ i ~ ~ Æ ~ . c' ~ U' ~ d ~ ~ b N II i IIIIIIIII¡ ~e[§r;~ßJIDJ~llæ Q) ro () CJ) z~ 06 '<t2~ 8 ;>,~ ~(Qð ¡::¡ 'õ >- ç :; C3 -, ¡¡; ¡,> " a ({)