Loading...
HomeMy WebLinkAbout2005-Building e. OSHKOSH ON THE WATER GRADE STAKE FORM Grade Stake Number 7298 Name JOHN STRaUS Address 1095 ZACHER DR Create Date 09/20/2005 Lot 51 &52 Block Ward Subdivision 1ST ADD'T ISLAND VIEW Zone Street Number Lot Dimensions I I Sidewalk Existing Building Grade Elevation Stakes Set At. Site 09/20/2005 Set By Department of Public Works I, the undersigned, owner or agent of the above described property agree to has commenced. Plbg LiclCert# 268702 Pibg LiclCert# 171802 Plbg LiclCert# 3560 LiciCert # Wisconsin Department of Industry, Labor and Human Relations Safety and Buildings Division P.O. Box 2509 Madison, WI 53701-2509 Wisconsin Statues 101.63, 101.73 ~ Constr Lot Area 0 Repair 0 Raze 0 Move ý Single Family 0 Two Family 0 Garage 0 Other (print): 0 Other: Unfinished Basement ~ Sq. ft Living Area ~ Sq. ft Garage 1387 Sq. ft. ~ Site Constnuctèd 0 Manufactured 1-Story ~ 2-Story 0 Other APPLICANT'S SIGNATURE WISCONSIN UNIFORM BUILDING PERMIT APp(íCATION Application No. 0116412 Parcel No. 0 HVAC 0 Eiec Mailing Address 1709 OAK ST Mailing Address P.O. BOX 1172 Mailing Address 2602 AMERICAN DR Mailing Address 2180 AMERICAN DR Mailing Address PO BOX 118 0 Plbg ~ Erosion 0 Other: OSHKOSH Teiephone No. WI 54901 - 0000 Telephone No. Wi 54912 -1172 730-2988 Telephone No. WI 54914 - 9010 920-738-5885 Telephone No. (920) 733-4713 Telephone No. WI 54952 -118 920-733-8125 N,R E(or)W Block No. APPLETON APPLETON NEENAH WI 54956 -0 MENASHA S . ft. Subdivision Name 1ST ADD'T ISLAND VIEW Front 1/4. 1/4,Section Lot No. 51 & 52 Rear Left ,T Right Entrance Panel Size:~am Service: 0 Overl1ead ~ Underground Ý Forced Air Furnace ~ Radiant Baseboard or Panel 0 Heat Pump ~ Boiler ~ Central Air Conditioning Other Fuel Nat L.P. Oil Eiec. Ga Space Htg ~ 0 WaterHtg ~ 0 Dwelling unit will have 3 kilowatt or more installed electric space heating equip. Infiltration control option is: 0 Full sealing of joints. 0 Blower door test. 0 Exterior air infiltration barrier. " Concrete 0 Masonry 0 Treated Wood 0 Other Sewer ~ Municipal 0 Septic Permit No. 38667 BTU/HR 25664 BTU/HR 0 Seasonal ~ Permanent 0 Other s permit is issued purs t the following conditions. Failure to comply may result in suspension or APPROVAL CONDITIONS revocation of this penmit or other penalty SEE" STANDARD CONDITIONS OF APPROVAL" SHEET Inspection Wis. Permit Seal Other Construction HVAC Electrical D Plumbing 0 Erosion 0 $30.00 Total SBD-5823 (R. 07/92) $105.00 Date 9/20/05 326627 Cert. No. 70330 G. OSHKOSH ON THE WATER Job Address PARKLAND DEDICATION FEE COLLECTION RECORD Name 1095 ZACHER DR JOHN STRaUS Date 09/22/2005 Address 1709 OAK ST OSHKOSH WI 54901 Subdivision 1ST ADD'T ISLAND VIEW Lot 51 &52 Building Permit Number 0116412 Number of Dwelling Units Number of Structures Fee Required $200.00 Fee Paid Owne(s Signature 9wlh 1J ~ Inspector's Signature Date q lJ:J/n:<,- , Date L 01 S / -t- 5;), I'SL!rHD VIEW [$TATe; ~rrY OF O$HKtJSff to J.NIV£l3A-GD ClJL/AITY ]1" - 3D 'I $-¥.r ~ ~ t-- .8I, 5 III ~~ ~~ ~ d)~ 53,~L_- l/f ¡,Slo ,--, -c:=' r,,"~".'. ~- I,:r)j /~' -I~ 1 ~""'\ " , ..;, .,¡. '" ,cl~ to 3.. 0- t'- '<J - ... <:3 ~~'-C~ ,~~ .oi:i..¡ OI\~~ ...~~~ iï\~ ~~-.:!~ I/' r 1-¡í "" ~¡t~ gÞ.1 ~ . ,&:/fIrW;;Ø~ .Y"~. 1$(1f¿J:J <;S:9':'n' \, "" ~ Iii. P .b.9 1.., IO~ <It t- O( 10 ~~ ~ \ - ~ 'õ 0"- ..i) ~ f'rJ' /;; N À C\ :t: ~ b ~ ..... ~ 5/.g1 ~ OfHKOfH ON m, WAm City of Oshkosh Division of Inspection Services 215 Church Avenue PO Box 1130 Oshkosh WI 54903-1130 Office 920-236-5050 Fax 920-236-5084 PLAN REVIEW Project Address: 1 095 Zacher Dr Submitted By:Griffin Builders Inc Plan Number:G 1-051-0905 Date Reviewed: 9/22/2005 Phone Number: 730-2988 D Mailed D Faxed IZ] Delivered Date: Reviewed By: JZ Phone: 920-236-5119 Result of Plan Review: IZ] Conditionally Approved D Withheld Pending Approval of Additional Infonnation D Not-Approved, Plans Returned for Revisions Conditious Noted on Plan Review 1) Beam calculations shall be provided (prior to pouring the basement floor or ITaming inspection) for any beams or headers over 6' in length or that have point loads imposed on. 2) Verify post pad sizes upon review of the beam calculation for the basement beam. 3) Truss plans and layout shall be posted onsite to conduct the rough ITaming inspection. 4) Screen room shall be designed to meet uplift and live loads. 5) One set of sanitary sewer and water services shall be properly abandon due to the lot combination. "-'=' of _."0=" Qa,-Þ ¥- ~,.. <J.k*,.~ ". . '.' ~ CITY OF OSHKOSH S T ANDÃ1ID-COW In 6NS'o1?A1>P'RO"VA-r:------'w- ..w_-"_._~_. Project Addùss ' /O"J5 Zacker Permit Dr Please read the following information and sign at the bottom to acknowledge that you have read and agree to comply with these conditions. I. All habitable rooms provided with 8% light and 3.5% ventilation. Bedrooms located on the second floor or below ground levil Illustbe provided with egress windows in addiiionto theliglítiüídventíIiition reqmrements. ", BaseIllent windows are also r"quired to have wiridc>wwèlrareas iriã.ccordancewithILBRZI.O3. '. 2. Garage spaces shall bè separated ITom the dwelling unit in accordance, with ILHR2T:O8: Theç!oor and ITame assemblYbetwèenthe dwèllingunifiüídan attiiched garage shall be I abèl ê d.' byanindeiieridëiiDêštingâii ency"äS'1íaving'ìíñìmimum11re-rêštstiv è ratiìig~õtTit'"...w,... .~..u .", minutes.. AIldryWalIjoiiítsarê feqiíiredtobetiîpeâ7šeiî1e"ãûûfešs'ihêjõiñts-âTê:fittedso' ... ,.,.. that the gap is no more than a dimes thickness ( 1/20-inch) and backed by solid wood or drywåll with the joints staggered. 3. All penetrations in exterior walls must be sealed prior to the insulation inspection. This includes holes in the top and bottoIll plates, gaps arouÍldheiîfirigdùCts; ãñdholešiiith"ê" return air spaces. 4. Smoke detectors are required on every floor and within 6' of all bedrooms. The smoke detectors are required to be hardwired and iritercorníected. " .. . 5. Hydromassage tubs are required to have an access panel to' motor. The access panel must be accessible ~ithol.lt removing the finish of the house. 6. All overITallling must be desigriedby die truss Illanùfiîctiit'ëi, according to standards set by the truss plate institute, or structural calculations must be provided prior to the rough builç!ing irispection.' . 7. Truss plans must be submitted and approved prior to ITallling the roof. . Truss plans including the triísšliîyoùtmllši be providèdonšlteiîftheioùghbïiading inspection. In addition to the triísš plans, Illicrc>lalll calcu1iîfiol1.s Illùstbe provIded öíiši{ë . at the rough building inspection for all Illicrolams with point loads on them. j ! ;1 8. Cakulatiönsmllst beprovided'foiãfl èaÏítífêÿêiêèf fiôors Wifupoini]õaâš: "Floõftrusseš arid TTI's niust be designed for the cantilevered'areas. 10. II. 12. 13. 14. 15. 16. The property owner and applicant is responsible for compliance with ILHR 21.125 (Erosion Control). When installing access drives, a minimum of2"-3" diameterstone is required in additic) l toJlrninirnnm of 6" depth, 30'-50' length, and 14'-20' width. Erosion control measures must bernaintaineduntil the.la}Y!l. i¡L~stablished." .."""'" ~ All störrh sewer inlets must be protected with approved erosion control devices. Tracking (i.e. sediment) must be removed from the ,street a,tthee!!<:l.9fe¡¡.ShF..9r!<.<:l.ay. Repair any siltation or erosipn <lanwge to adjoining surfaces and dIainageways resulting from land development or disturbing activities. The building placard must be posted on site at all times. Once the rough framing is up the placard must be posted on the patio door or on a kitchen window. If the placard is not present at any inspection, stop work orders will be posted. Additional placards can be obtained through our department if the cards are misplaced. All mechanicals must be roughed in prior to requesting the rough building inspection. If on the inspection the mechanicals are npt roughed in, the inspection will fail and a $100 re-inspection fee will be charged. Attached is acopy of the final inspection checklist. At the final inspection all items pn this list must be completed to avoid the $100 re-inspectionfee per inspection. When requesting final inspections please note that a minimum of2 days notice is needed from the time the inspection is ready. Furniture is only allowed to be placed in the center of the garage floor and a minimum of a 3' pathway must be provided around the walls of the garage. At the final inspection no furniture or personal belongings are allowed in the house. Appliances such as the stove, refrigerator, washer, and dryer are not to be set in place due to the electric¡¡linspector needing to look at the power serving the appliances. A 6' stepladder must be on site at the final inspection to provide access to the attic. The building placard must remain on the patio door or on a kitchen window until occupancy is approved. Occupancy is not allowed prior to the placard having all of the final inspection apprôvedstickersôîì'the båckside.Jf¿j§i:upåñcYôccuritpiiõfiothe inspections being approved daily citations will. be iss.ue<l~th.nQfurt:her.!!Qt¡ceJ?_eing given. 17. All site grading must be done in accpr<lance ~th.the approved drainage plan on fiJejn the.. S~:::F:;'~ ~ ~,9/~~Ä-