HomeMy WebLinkAbout0116432-Plumbing
~
OSHKOSH
ON THE WATER
Job Address 30 W SOUTH PARK AVE
CìTY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
Owner RANDY R 0 MAAS/SUZETTE M SCANL
Contractor DRUCKS PLUMBING
...n.___. ._n.- Category 410 - Residential-Interior
Bathtub 0 Shower 0 Water Softner 0 Wait St. 0
Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0
Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0
Toilet 0 Disposal 1 Bidet 0 Sculry Sink 0
Res. Sink 1 Dishwasher 0 BeerTap 0 Hand Sink 0
Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0
Misc. 0
Fixtures
Use/Nature r'~ ""~, ",'
of Work
Shamp Sink 0
FlrlWst Sink 0
Catch Basin 0
Wash Ftn 0
Urinal 0
Standp Rec 0
Ice Maker 0
Gar Drain 0
Soda Disp 0
No
116432
Create Date 09/20/2005
Plan
n~~..~
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap --9.
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Size
Material
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$20.00 0 Permit Voided I
Sanitary Sewer
Storm Sewer
Water Service
Valuation
Permit Fees
$0.00
Plan Approval
Issued By
In the performance of this work, I agree to perform all work pursuant to rules governing the described oonstruction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to oontact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 355
Agent/Owner
MENASHA
WI 54952 - 0000
Telephone Number 426-2654
Parcel Id #
0303680000
Date 09/2212005
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.