HomeMy WebLinkAbout0116410 P
0
OSHKOSH
ON THE WATER
Job Address 1102 MOUNT VERNON ST
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116410
Create Date 09/22/2005
Owner CORY AlJULIE A STELLMACHER
Plan
Contractor KIENAST L G UTILITY CONSTRUCTION
Category 401 - Residential-Exterior (laterals)
Bathtub 0
Whirlpool 0
Lavatory 0
Toilet 0
Res. Sink 0
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classnm Sink
Breakrm Sink
Ejector/Grind
0
0
0
0
0
0
0
0
0
Water Softner
Local Waste
Clothes Wshr
0
0
0
0
0
0
0
0
0
Wait.SI.
Ice Chest
Exam Sink
Sculry Sink
Hand Sink
Plaster Sink
Surgeons Sink
F Prep Sink
Serv Sink
0 Shamp Sink ----.2
0 Flr/Wst Sink 0
0 Catch Basin 0
0 Wash Ftn 0
0 Urinal 0
0 Standp Rec 0
0 Ice Maker 0
0 Gar Drain 0
0 Soda Disp 0
Coffee Maker 0
Int Grease Trap 0
Ext Grease Trap 0
RPZ Valve 0
Eye Wash Statn 0
Wtr Sewer Mtrs 0
Deduct Meters 0
Wtr Usage Mtrs 0
Bidet
Beer Tap
Lab Sink
Sterilizer
Dip Well
Drink Ftn
Use/Nature
ofWork
rc~-' .,". ~
Sanitary Sewer
Size
4"
Storm Sewer
Water Service
Material
Plastic
Type
Lateral
#
Conn. Type
Repair
1
0
0
0
0
Parcelld #
1003390000
:::::i:/~O -? ~ a::¿ $0.00
Permit Fees
Date 09/22/2005
$50.00 0 Permit Voided I
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 414-231-0898
Address 765 N WASHBURN
AgenVOwner
OSHKOSH
WI 54904 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.