HomeMy WebLinkAbout0116409-Plumbing (water heater; sump pump)
e
OSHKOSH
ON THE WATER
Job Address 1313LAMARAVE
CITY OF OSHKOSH
PLUMBING PERMIT - APPLICATION AND RECORD
No
116409
Owner MARLENE H DELORME
Create Date 09/22/2005.
Plan
Contractor KEITH PETERSEN PLUMBING
- Category 410-Residential-lnterior
Bathtub 0 Shower ~ Water Softner ~ Wai!.S!. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain ~ Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
Lavatory 0 Lndry Tray 0 Clothes Wshr ~ Exam Sink 0 Catch Basin ~ Ext Grease Trap 0
Toilet ~ Disposal ~ Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
Res. Sink ~ Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink ~ Sump Pump 1 Lab Sink ~ Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 1 Classrm Sink ~ Sterilizer 0 Surgeons Sink 0 Ice Maker ~ Deduct Meters 0
Site Drain ~ Breakrm Sink ~ DipWell ~ F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain ~ Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. --.-!
Fixtures
Use/Nature
of Work
SFR/ Replacing the water lines, water heater and sump pump.
Size Material Type # Conn. Type
Sanitary Sewer 0
0
0
0
0
Storm Sewer 0
0
0
0
0
Water Service 0
0
0
0 Parcelld #
0 1202380000
Valuation
Plan Approval
$0.00
Permit Fees
$21.00 0 Permit Voided I
Issued By
Date 09/22/2005
In the performance of is work, I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to ny necessary a provals before starting such activity.
Signature 11 .
AgenUOwner
Date
'J<-9-# '<7 ..J;
Address 1600 HAMILTON CT
LITTLE CHUTE
WI 54140 .2534
Telephone Number
To schedule inspections please call the Inspection Request line at 236.5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.