Loading...
HomeMy WebLinkAbout2005-Building (roofing alterations) e OSHKOSH ON THE WATER Job Address 1103WASHINGTONAVE CITY OF OSHKOSH No 116382 BUILDING PERMIT -APPLICATION AND RECORD Owner BRIAN J/KIM E WOGERNESE Create Date 09/21/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 FI. Bedrooms Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.FI. 0 Projection I Finished/Living Canopies Garage ~Sq.FI. Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units 0 # Structures ~ Park Dedication Use/Nature RES/ Roofing alterations - remove liie roof, instail new underlayment (ice & water shield), reinstail liies, Instail new copper 9utters. ofWork Plumbing Contractor HVAC Contractor Electric Contractor $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Fees: Valuation Issued By: Date 09/21/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0203360000 In the performance of this work I agree to perform ail work pursuant to rules 90verning the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. i3~ .....--- Date Q - J /-0 3- Signature Agent/Owner Address 1103 WASHINGTON AVE OSHKOSH WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.