HomeMy WebLinkAbout2005-Building
e
OSHKOSH
ON THE WATER
Job Address 104 PROSPECT AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116401
OWner MRiMRS TIMOTHY SCHWALBE
Create Date
09/21/2005
Contractor
KLEIN'S HOME IMPROVEMENT
Designer
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
0 Pier 0 Other
0 Treated Wood
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
0 Projection I
Finished/Living
Canopies ~
Garage
~Sq.Ft.
Signs
0
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
Occupancy Permit Not Required
Flood Plain
Height Pennit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFRI Remodeling the 1st floor bathroom. Gutting the walls, installing new insulation and drywall. An exhaust fan will be installed. No
of Work bearing walls will be moved.
HVAC Contractor
Plumbing Contractor
SOPER PLUMBiNG
Electric Contractor
DILLMAN ELECTRIC
Fees: valuati~
Issued By: k
-
$4,800.00 Plan Approval
$0.00 Permit Fee Paid
$44.00 Park Dedication
$0.00
Date 09/21/2005
Final/O.P, 00/00/0000
0 Permit Voided I
Parcelld # 1007930000
In the performance of this work I agree to perform all work pursuant to ruies goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
:~~~~::~::vecuì!l¡;¡¡;sary approvals before starting such activity. D~q -) I~OJ
( =-- f'I" AgenUOwner { -
Address 972 E SUNNYVIEW RD LOT 9 OSHKOSH WI 54901 - 0000 Telephone Number (920) 231-5301 HOM
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.