Loading...
HomeMy WebLinkAbout2005-Building (platform lift & shaft) e OSHKOSH ON THE WATER Job Address 2155 S OAKWOOD RD CITY OF OSHKOSH No 116400 BUILDING PERMIT. APPLICATION AND RECORD Owner MERIDIAN MK LLC Create Date 09/21/2005 Designer Contractor LEACH BROS. Category 211 - Alteration Industrial Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement -~ Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 Projection I Canopies Signs Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain - # Dwelling Units ~ Height Permit Park Dedication # Structures ~ Use/Nature Distribution Warehouse/Install platform lift and shaft. Use rolling fire shutler doors from former opening to mezzanine. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees valuatlb $34,000.00 Plan Approval ISSU~d By: . ~ \;1) $0.00 Permit Fee Paid $166.00 Park Dedication $0.00 Date 09/21/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1364000000 In the perfonmance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this penmlt application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to s re an~ necessary approvals before starting such activity. Signature Agenl/Owner Oshkosh Date ?'h / /0 Address 2883 RUSCHFIELD DR WI 64904 - 0000 Telephone Number 420-5005 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.