HomeMy WebLinkAboutDNR APPROVAL (sewerage system)
State of Wisconsin \ DEPARTMENT OF NATURAL RESOURCES
September 7, 2005
101 S. Webster St.
Box 7921
Madison, Wisconsin 53707-7921
Telephone 608-266-2621
FAX 608-267-3579
TTY Access via relay - 711
Jim Doyle, Governor
Scott Hassett, Secretary
WISCONSIN
DEPT. OF NATURAL RESOURCES
CITY CLERK
CITY OF OSHKOSH
215 CHURCH AVE.
P.O. BOX 1130
OSHKOSH, WI 54902 1130
SEP 1 :3 2005
DNR PROJECT NO. S-2005-0934
DNR REGION: NER
.c.,{Çr().'-'",yo"" k~4>c:A-
DNR PLAN APPROVAL for SEWERAGE SYSTEM IMPROVEMENT
ç¡-;
Wastewater System Owner:
Consultant:
Engineer:
Date Project Received:
Project Description:
OSHKOSH, CITY
OMNI ASSOCIATES
ROBERT D. GIVENS, P.E.
September 2, 2005
PLANS for SEWER
Sanitary sewer extension for the public sewer in Hemiock Court
(beginning with manhole 13 and then downstream) and in Fraser
Drive from Hemlock Ct. to Edgewood Road to serve the Edgewood
Viliage - Phase I subdivision
The proposed sewerage system improvement included in the above referenced plan subnúttal is hereby
approved in accordance with s. 281.41, Wis. Stats., subject to the following conditions:
1. That a preconstruction conference be held to fanúliarize the contractor(s) and inspector(s) with the
plans, specifications, and conditions of approval.
2. That a competent resident inspector be provided during the course of construction.
3. That erosion control methods be used to prevent siltation to lands and waterways in the vicinity of the
construction activity.
4. That all storm and other clear water, including that ITom sump pumps, roof drains, cistern overflows, and
building foundation drains be excluded from these approved sewers (not applicable for combined sewers).
5. That the improvements be installed in accordance with the approved plans and specifications, and the
above conditions, or subsequent essential and approved modifications.
This approval is valid for four years ITom the date of approval. The Department reserves the right to order
changes or additions should conditions arise making this necessary.
If you believe you have a right to appeal this decision, you may file a request for a contested case hearing
pursuant to s. 227.42, Wis. Stats., or fIle for judicial review under s. 227.52 and 227.53, Statutes. You have 30
days after this approval is mailed to file your written request for hearing or file and serve your petition for
judicial review. Your request for hearing or petition for judical review must name the Secretary of the
Department as respondent. This notice is provided pursuant to s. 227.48, Statutes.
STATE OF WISCONSIN
DEPARTMENT OF NATURAL RESOURCES
For the Secretary
i:!::.SITW
Plan Review Engineer
~)~ ~ riñ ~ Le rR\.
Inl SE' 1 2 znos ~
CITY CLERK'S OFFICE
cc: Engineer
ECWRPC - No. 2005-153