Loading...
HomeMy WebLinkAboutDNR APPROVAL (sewerage system) State of Wisconsin \ DEPARTMENT OF NATURAL RESOURCES September 7, 2005 101 S. Webster St. Box 7921 Madison, Wisconsin 53707-7921 Telephone 608-266-2621 FAX 608-267-3579 TTY Access via relay - 711 Jim Doyle, Governor Scott Hassett, Secretary WISCONSIN DEPT. OF NATURAL RESOURCES CITY CLERK CITY OF OSHKOSH 215 CHURCH AVE. P.O. BOX 1130 OSHKOSH, WI 54902 1130 SEP 1 :3 2005 DNR PROJECT NO. S-2005-0934 DNR REGION: NER .c.,{Çr().'-'",yo"" k~4>c:A- DNR PLAN APPROVAL for SEWERAGE SYSTEM IMPROVEMENT ç¡-; Wastewater System Owner: Consultant: Engineer: Date Project Received: Project Description: OSHKOSH, CITY OMNI ASSOCIATES ROBERT D. GIVENS, P.E. September 2, 2005 PLANS for SEWER Sanitary sewer extension for the public sewer in Hemiock Court (beginning with manhole 13 and then downstream) and in Fraser Drive from Hemlock Ct. to Edgewood Road to serve the Edgewood Viliage - Phase I subdivision The proposed sewerage system improvement included in the above referenced plan subnúttal is hereby approved in accordance with s. 281.41, Wis. Stats., subject to the following conditions: 1. That a preconstruction conference be held to fanúliarize the contractor(s) and inspector(s) with the plans, specifications, and conditions of approval. 2. That a competent resident inspector be provided during the course of construction. 3. That erosion control methods be used to prevent siltation to lands and waterways in the vicinity of the construction activity. 4. That all storm and other clear water, including that ITom sump pumps, roof drains, cistern overflows, and building foundation drains be excluded from these approved sewers (not applicable for combined sewers). 5. That the improvements be installed in accordance with the approved plans and specifications, and the above conditions, or subsequent essential and approved modifications. This approval is valid for four years ITom the date of approval. The Department reserves the right to order changes or additions should conditions arise making this necessary. If you believe you have a right to appeal this decision, you may file a request for a contested case hearing pursuant to s. 227.42, Wis. Stats., or fIle for judicial review under s. 227.52 and 227.53, Statutes. You have 30 days after this approval is mailed to file your written request for hearing or file and serve your petition for judicial review. Your request for hearing or petition for judical review must name the Secretary of the Department as respondent. This notice is provided pursuant to s. 227.48, Statutes. STATE OF WISCONSIN DEPARTMENT OF NATURAL RESOURCES For the Secretary i:!::.SITW Plan Review Engineer ~)~ ~ riñ ~ Le rR\. Inl SE' 1 2 znos ~ CITY CLERK'S OFFICE cc: Engineer ECWRPC - No. 2005-153