HomeMy WebLinkAbout0116392-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 2233 ALLERTON DR
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116392
Owner RAYMOND/BONNIE GASKILL
Create Date
09/21/2005
Designer
Contractor
ARMR INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft.
Finished/Living ~Sq.Ft. Bedrooms 0 Stories
Garage ~Sq.Ft. Baths
D Projection I
Canopies
Signs
0
Foundation
. Poured Concrete 0 Floatin9 Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
# Dwelling Units -----2
# Structures
-----2
Park Dedication
Use/Nature SFR / TEAR OFF & REPLACE EXISTING ROOFING ON HOUSE & GARAGE. NO STRUCTURAL CHANGES
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
$5,280.00 Plan Approval
$0.00 Permit Fee Paid
$50.00 Park Dedication
$0.00
Fees: Valuation
Issued By:
Date 09/21/2005
Flnal/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1316820000
In the performance of this work I agree to perform all work pursuant to rules goveming the described constructjon.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 318 PROSPECT AVE
AgenVOWner
N FOND DU LAC WI 54937 - 0000
Telephone Number
920-923-2459
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.