HomeMy WebLinkAbout0116395-Building
e
OSHKOSH
ON THE WATER
Job Address 112W12THAVE
CITY OF OSHKOSH
No
116395
BUILDING PERMIT - APPLICATION AND RECORD
Owner NELLY H BERGER
Create Date
09/21/2005
Designer
Contractor
OWNER
Category
140 -Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----2. Sq. Ft.
----2. Sq. Ft.
Rooms
0
Height 0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
----2. Sq. Ft.
Baths
Signs
----2.
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
1# Dwelling Units 0
1# Structures
0
Use/Nature SFRI Partioning off one bedroom to create a bathroom. The bathroom will have an exhaust fan installed and a 32" door. All construction
of Work hall comply with local and state building code requirements.
HVAC Contractor
UNKNOWN???
Plumbing Contractor
SOPER PLUMBING
Electric Contractor
UNKNOWN????
Fees: Valu~ti~.-
Issued By: ~\,\)...
$1,000.00 Plan Approval
$0.00 Permit Fee Paid
$20.00 Park Dedication
$0.00
Date 09/21/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld 1# 0302990000
In the performance of this work I agree to perfonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the penmit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature\.p ~Î eft, ;Vg"'iA
¡! AgenUOwner
Address 112 W 12TH AVE OSHKOSH WI 54902 - 6016
Date~ ~/J//)OJ-
Telephone Number 1,",,0 ';¡3~- 01'-12
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.