Loading...
HomeMy WebLinkAbout0116388-Building (roof) e OSHKOSH ON THE WATER Job Address 727 W 5TH AVE CITY OF OSHKOSH No 116388 BUILDING PERMIT - APPLICATION AND RECORD Owner BRUCE A KUHN Create Date 09/21/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. Rooms 0 Height 0 Ft. Finished/Living -----.2 Sq. Ft. Bedrooms 0 Stories Garage -----.2 Sq. Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature DUPLEX / TEAR OFF AND REPLACE ROOFING ON 1/8 OF HOUSE (PARTiAL), NO STRUCTURAL CHANGES of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1,000.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: Date 09/21/2005 Final/O.P. 00/00/0000 D PenmitVoided I Parcelld # 0604140000 In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonm the work described in this penmit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvals befor starting such activity. Date 1/2..I/OS;- Agent/Owner Signature Address 727 W 5TH AVE OSHKOSH WI 54902 - 5834 Telephone Number,23' 5' - 5'" gq To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.