HomeMy WebLinkAbout1997-Plumbing (bathtub)
~
OSHKOSH
ON THE WATER
Job Address 863 WRIGHT ST
CITY OF OSHKOSH
No
60677
PLUMBING PERMIT - APPLICATION AND RECORD
Contractor MOREMAN PLUMBING
Owner FLANAGAN
Create Date 08/22/1997
Plan
Category 410 - Residential-Interior
Bathtub 1
Whirlpool ~
Lavatory ~
Toilet 0
Res. Sink ~
Bar Sink 0
Water Heater 0
Site Drain 0
Roof Drain 0
Misc. 0
Fixtures
Shower
Floor Drain
Lndry Tray
Disposal
Dishwasher
Sump Pump
Classrm Sink
Breakrm Sink
Ejector/Grind
0 WaterSoftner 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0
0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0
0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 WtrSewerMtrs 0
0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
-~.
of Work
REPLACE BATHTUB (503 Scott)
Sanitary Sewer
Size
Material
Storm Sewer
Water Service
Type # Conn. Type
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
$10.00 D Permit V~
Parcelld #
0500920000
Valuation
$900.00
Plan Approval
Issued By
$0.00
Permit Fees
Date 10/13/1997
In the performance of this work, I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority 10 enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the
easement holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Telephone Number 231-9191 MOBIL JA~
Address PO BOX 1325
Agent/Owner
OSHKOSH
WI 54901 - 0000
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.