Loading...
HomeMy WebLinkAbout1997-Plumbing (bathtub) ~ OSHKOSH ON THE WATER Job Address 863 WRIGHT ST CITY OF OSHKOSH No 60677 PLUMBING PERMIT - APPLICATION AND RECORD Contractor MOREMAN PLUMBING Owner FLANAGAN Create Date 08/22/1997 Plan Category 410 - Residential-Interior Bathtub 1 Whirlpool ~ Lavatory ~ Toilet 0 Res. Sink ~ Bar Sink 0 Water Heater 0 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind 0 WaterSoftner 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0 0 Local Waste 0 Ice Chest 0 Flr/Wst Sink 0 Int Grease Trap 0 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZ Valve 0 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 WtrSewerMtrs 0 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 -~. of Work REPLACE BATHTUB (503 Scott) Sanitary Sewer Size Material Storm Sewer Water Service Type # Conn. Type 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 $10.00 D Permit V~ Parcelld # 0500920000 Valuation $900.00 Plan Approval Issued By $0.00 Permit Fees Date 10/13/1997 In the performance of this work, I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority 10 enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Telephone Number 231-9191 MOBIL JA~ Address PO BOX 1325 Agent/Owner OSHKOSH WI 54901 - 0000 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.