HomeMy WebLinkAbout0116367-Building (windows & door)
~ CITY OF OSHKOSH No 116367
OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD
ON THE WATER
Job Address 1335 S WESTHAVEN DR Owner ROBERT M POUZAR Create Date 09/20/2005
Designer
Contractor
WASCO - WISCONSIN ALUMINUM SUPPLY CC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
----.2 Sq. Ft.
----.2 Sq. Ft.
Rooms
Height 0 Ft.
0 Projection I
Canopies 0
Finished/Living
Bedrooms 0
Stories
Signs
0
Garage
----.2 Sq. Ft.
Baths
Foundation
0 Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
UselNature
ofWork
FR/ Repalce 21 double hung windows, 1 double casement and 1 patio door, wrap trim with aluminum.
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation
$13.711.00 Plan Approval
$0.00 Permit Fee Paid
$94.00 Park Dedication
$0.00
Issued By:
Date 09/20/2005
Final/D.P. 00/00/0000
0 Permit Voided I
Parcelld # 1312650000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work
described in tI1is permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2546 AMERICAN OR
Agent/Owner
APPLETON
WI 54914 - 0000 Telephone Number
920-730-0099
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.