Loading...
HomeMy WebLinkAbout0116367-Building (windows & door) ~ CITY OF OSHKOSH No 116367 OSHKOSH BUILDING PERMIT. APPLICATION AND RECORD ON THE WATER Job Address 1335 S WESTHAVEN DR Owner ROBERT M POUZAR Create Date 09/20/2005 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY CC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft. ----.2 Sq. Ft. Rooms Height 0 Ft. 0 Projection I Canopies 0 Finished/Living Bedrooms 0 Stories Signs 0 Garage ----.2 Sq. Ft. Baths Foundation 0 Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ UselNature ofWork FR/ Repalce 21 double hung windows, 1 double casement and 1 patio door, wrap trim with aluminum. Plumbing Contractor HVAC Contractor Electric Contractor Fees: Valuation $13.711.00 Plan Approval $0.00 Permit Fee Paid $94.00 Park Dedication $0.00 Issued By: Date 09/20/2005 Final/D.P. 00/00/0000 0 Permit Voided I Parcelld # 1312650000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in tI1is permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2546 AMERICAN OR Agent/Owner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.