Loading...
HomeMy WebLinkAbout0116365 B e OSHKOSH ON THE WATER Job Address 1950 S OAKWOOD RD CITY OF OSHKOSH No 116365 BUILDING PERMIT - APPLICATION AND RECORD Owner DAVID AILiNDA G KOCH Create Date 09/20/2005 Designer Contractor WASCO - WISCONSIN ALUMINUM SUPPLY C( Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. 0 Proje~~ Finished/Living Bedrooms 0 Stories Canopies ~ Garage ~Sq.Ft. Baths Signs 0 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ~FRI Repalce 7 double hung and 1 triple casement window. wrap trim with aluminum. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $5,361.00 Plan Approval $0.00 Permit Fee Paid $50.00 Park Dedication $0.00 Issued By: Date 09/20/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1319130000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starfing such activity. Signature Date Address 2546 AMERICAN DR AgenUOwner APPLETON WI 54914 - 0000 Telephone Number 920-730-0099 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.