HomeMy WebLinkAbout0116380-Building (foundation)
e
OSHKOSH
ON THE WATER
Job Address 1110-1120BAUMANST
CITY OF OSHKOSH No 116380.'Ói::;)Ñ~ð
BUILDING PERMIT - APPLICATION AND RECORD (c:,~~1Z :"\1\\
~A1"~
Owner WAYNE GAYHART Create Date 09/06/2005
Designer
Contractor
WAYNE GAYHART
Category
123 - Foundation Permit Duplex
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
---2 Sq. Ft.
---2 Sq. Ft.
Rooms
0
Height 0 Ft.
0 Projection I
Canopies 0
Finished/Living
Bedrooms
Stories 1
Garage
---2 Sq. Ft.
Baths
Signs
---2
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
. Other
Piles with Grade Beam
Occupancy Permit Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
~
Use/Nature Duplex - foundation only for duplex with attached garages" Owner/contractor is proceeding at own risk pending variance approval for
of Work arage sizes or finai zoning approval of building plans.
HVAC Contractor
/
/
Plumbing Contractor
Electric Contractor
Fees: Valuation
Date 09/20/2005
Final/O.P. 00/00/0000
$70.000.00 Plan Approval
$0.00 Permit Fee Paid
$274.00 Park Dedication
$0.00
Issued By:
0 Permit Voided I
Parc.lld # 1608680100
in the performance of this work I agree to perform ali work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easeme..t .
hoider(s) and to secure any necessary approvais before starting su activity. o¡ ..---
~ ~/I~~
Agent'Owner
OSHKOSH WI 54901 - 0000 Telephone Number 920-233-0183
Address 1920 CLlFFVIEW COURT
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.