Loading...
HomeMy WebLinkAbout0116380-Building (foundation) e OSHKOSH ON THE WATER Job Address 1110-1120BAUMANST CITY OF OSHKOSH No 116380.'Ói::;)Ñ~ð BUILDING PERMIT - APPLICATION AND RECORD (c:,~~1Z :"\1\\ ~A1"~ Owner WAYNE GAYHART Create Date 09/06/2005 Designer Contractor WAYNE GAYHART Category 123 - Foundation Permit Duplex Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ---2 Sq. Ft. ---2 Sq. Ft. Rooms 0 Height 0 Ft. 0 Projection I Canopies 0 Finished/Living Bedrooms Stories 1 Garage ---2 Sq. Ft. Baths Signs ---2 Foundation 0 Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood . Other Piles with Grade Beam Occupancy Permit Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature Duplex - foundation only for duplex with attached garages" Owner/contractor is proceeding at own risk pending variance approval for of Work arage sizes or finai zoning approval of building plans. HVAC Contractor / / Plumbing Contractor Electric Contractor Fees: Valuation Date 09/20/2005 Final/O.P. 00/00/0000 $70.000.00 Plan Approval $0.00 Permit Fee Paid $274.00 Park Dedication $0.00 Issued By: 0 Permit Voided I Parc.lld # 1608680100 in the performance of this work I agree to perform ali work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easeme..t . hoider(s) and to secure any necessary approvais before starting su activity. o¡ ..--- ~ ~/I~~ Agent'Owner OSHKOSH WI 54901 - 0000 Telephone Number 920-233-0183 Address 1920 CLlFFVIEW COURT To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.