HomeMy WebLinkAbout0116357-Building (front stairs/rail)
e
OSHKOSH
ON THE WATER
Job Address 922 VINE AVE
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116357
Owner MRlMR:,; R DOUGLS HElL
Create Date
09/19/2005
Designer
Contractor
BEULEN & SONS CONSTRUCTION
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy 0 Fence 0 Raze
Class of Const:
Rooms 0 Height 0 Ft.
Bedrooms 0 Stories
Baths 0
Size
Zoning
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
D Projection I
FinishecIJLiving
Canopies
Garage
~-_J> Sq. Ft.
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature ~FRI Replacing the front stairs and handrails. The stairs and handrails shall be constructed to comply with current code requirements of
of Work 8" maximum risers, g" minimum treads and a 30"-38" high handrails.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
$2,500.00 Plan Approval
~
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Issued By:
Date 09/19/2005
Final/O.P. DO/DO/DODO
D Permit Voided I
Parcelld # 0506560000
In the performance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure ny necessary appro a before starting such activity.
Signature < d
Agent/Owner
Date
V 9-¡'1-o.!J
Address 922VINEAVE
OSHKOSH
WI 64901 - 3532
Telephone Number
233-2680
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.