Loading...
HomeMy WebLinkAbout0116357-Building (front stairs/rail) e OSHKOSH ON THE WATER Job Address 922 VINE AVE CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116357 Owner MRlMR:,; R DOUGLS HElL Create Date 09/19/2005 Designer Contractor BEULEN & SONS CONSTRUCTION Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 Size Zoning Unfinished/Basement ~Sq.Ft. ~Sq.Ft. D Projection I FinishecIJLiving Canopies Garage ~-_J> Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature ~FRI Replacing the front stairs and handrails. The stairs and handrails shall be constructed to comply with current code requirements of of Work 8" maximum risers, g" minimum treads and a 30"-38" high handrails. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $2,500.00 Plan Approval ~ $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Issued By: Date 09/19/2005 Final/O.P. DO/DO/DODO D Permit Voided I Parcelld # 0506560000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure ny necessary appro a before starting such activity. Signature < d Agent/Owner Date V 9-¡'1-o.!J Address 922VINEAVE OSHKOSH WI 64901 - 3532 Telephone Number 233-2680 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.