Loading...
HomeMy WebLinkAbout0116349-Building (windows) e OSHKOSH ON THE WATER Job Address 623 E IRVING AVE CITY OF OSHKOSH No 116349 BUILDING PERMIT - APPLICATION AND RECORD Owner ZACHARY D/GENE MALNORY Create Date 09/19/2005 Contractor OWNER Designer Category 141-ExteriorRemodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze ~ Zoning Class of Const: Size Finished/Living ----9. Sq. Ft. ----9. Sq. Ft. Rooms Height 0 Ft. 0 Projection I Unfinished/Basement Bedrooms 0 Stories Canopies ----9. Garage ----9. Sq. Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures ~ Use/Nature fFRILATE PERMIT/ Lower Unit "B" - Replace 7 windows - 3 in dining room 3" x 60",2 in living room 35" x 60", and one in bedroom, one ofWork I~~~;;::~~and one in bathroom. 'No Structural changes (in-fill only) ANY ADDiTIONAL VALUE OF WORK REQUIRES ADDITIONAL HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $1.700.00 Plan Approval $0.00 Permit Fee Paid $126.00 Park Dedication $0.00 Issued By: ~ . Date 09/19/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0405970000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement :~:~~::::nd~~~forestartingSUchactivity. Date 9/11105- Agent/Owner Address Oshkosh WI 54901 - 0000 Telephone Number ZO3-7( (J To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.