HomeMy WebLinkAbout0116342-Building (roof)
I
,
CITY OF OSHKbsH
i
BUILDING PERMIT - APPLICAhoN AND RECORD
Owner MICHAEUCOLLJEN STADLER
Contractor OWNER I
-------¡
I
Fence
No
116342
~
OSHKOSH
ON THE WATER
Job Address 1736 SANDERS ST
Create Date
09/14/2005
Designer
Category
141 - Exterior Remodeling
Plan
Zoning
Class of Const:
Raze
Type
. Building
0 Sign
0 Canopy
Size
Garage
----2 Sq. Ft.
Baths
0
Height
t
. Other
0 Ft.
D Projection I
Unfinished/Basement
----2 Sq. Ft.
----2 Sq. Ft.
Rooms
Finished/Living
Bedrooms 0
Canopies
Signs
Foundation
0 Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
Occupancy Permit Not Required
Flood Plain
Height Permit
# Structures
Park Dedication
# Owelling Units 0
~
Use/Nature SFRI Reroof - tear off existing roofing, instaU new felt. flashing, shingles, venting. "Replace misc. sheeting as/if necessary.
ofWork
HVAC Contractor
Fees: Valuation
$2,400.00 Plan Approval
$0.00
Plumbin Contractor
. I.
Penmlt Fee PaId
I
Electric Contractor
$32.00 Park Dedication
$0.00
Issued By:
Date 09/16/2005
FinaIlO.P. DO/DO/DODO
D Permit Voided I
Parcelld # 1410090700
In the performance of this work I agree to perform all work pursuant to rules goveming e described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongly urges the per it applicant to contact the easement
holder(s) and to sec ny neces ary ppr Is before fling such activity.
Signature
AgenUOWner
OSHKOSH
Date\" 9(rúo 10:::;-
Address 1736 SANDERS ST
WI 54902 - 6758
Telephone Number
To schedule inspections please call the Inspection Request line at 236-51 8 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if securf (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from' the time the project is ready.
I
--- - ~----- -