Loading...
HomeMy WebLinkAbout0116323-Building (roof) e OSHKOSH ON THE WATER Job Address 1312FAUSTAVE CITY OF OSHKOSH No 116323 BUILDING PERMIT - APPLICATION AND RECORD Owner MRiMRS WilLIAM HENTZ Create Date 09/16/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy Class of Const: 0 Fence 0 Raze Zoning Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height OFt. 0 Projection I Finished/Living Bedrooms Stories Canopies 0 Signs 0 Garage ~Sq.Ft. Baths 0 Foundation . Poured Concrete 0 Fioating Slab 0 Concrete Biock 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ~ Use/Nature 'SFRI Repair roof damage due to a tree that fell on the roof. Replacing a few rafters and reframing Ihal area of Ihe roof. All construction of Work hall meet minimum building code requiremenls. Plumbing Contractor HVAC Contractor Electric Contractor Fees: ValuatiO) Issued By: \ Y-- $3,000.00 Plan Approval $0.00 Permit Fee Paid $32.00 Park Dedication $0.00 Date 09/16/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0608771000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party. if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to ecure any ne~essary approvals before starting such activity. Signature Agent/Owner Oshkosh Date ~~ 9//6' ¡b Address WI 54901 - 0000 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perfonmed within two business days from the time the project is ready.