HomeMy WebLinkAbout0116323-Building (roof)
e
OSHKOSH
ON THE WATER
Job Address 1312FAUSTAVE
CITY OF OSHKOSH
No
116323
BUILDING PERMIT - APPLICATION AND RECORD
Owner MRiMRS WilLIAM HENTZ
Create Date
09/16/2005
Designer
Contractor
OWNER
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
Class of Const:
0 Fence
0 Raze
Zoning
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
OFt.
0 Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Signs
0
Garage
~Sq.Ft.
Baths
0
Foundation
. Poured Concrete 0 Fioating Slab
0 Concrete Biock 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units 0
# Structures
~
Use/Nature 'SFRI Repair roof damage due to a tree that fell on the roof. Replacing a few rafters and reframing Ihal area of Ihe roof. All construction
of Work hall meet minimum building code requiremenls.
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: ValuatiO)
Issued By: \ Y--
$3,000.00 Plan Approval
$0.00 Permit Fee Paid
$32.00 Park Dedication
$0.00
Date 09/16/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 0608771000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which itis not a party. if you perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to ecure any ne~essary approvals before starting such activity.
Signature
Agent/Owner
Oshkosh
Date ~~ 9//6' ¡b
Address
WI 54901 - 0000
Telephone Number
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not perfonmed within two business days from the time the project is ready.