HomeMy WebLinkAbout0116343-Building
e
OSHKOSH
ON THE WATER
Job Address 1215 NEAGLE ST
CITY OF OSHKOSH
No
116343
BUILDING PERMIT - APPLICATION AND RECORD
Owner EVERGREEN MANOR INC
Create Date
09/16/2005
Designer
Contractor
DAN V BINDER CONSTRUCTION
Category
140 - Interior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement ----2 Sq. Ft. Rooms 0 Height 0 Ft.
Finished/Living ----2 Sq. Ft. Bedrooms 0 Stories
Garage ----2 Sq. Ft. Baths
0 Projection I
Canopies
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature ßFRllnstalllng new kichen cabinets, new fixtures in the bathroom and laundry/half bath and re-roofing the buildIng.
of Work
HVAC Contractor
Plumbing Contractor
J RASMUSSEN PLUMBING INC
Electric Contractor
BEEZ ELECTRIC INC
Fees: Valuation
Issued By: ~l\;v
$20,000.00 Plan Approval
$0.00 Permit Fee Paid
$124.00 Park Dedication
$0.00
Date 09/16/2005
FinaIlO.P, 00/00/0000
0 Permit Voided I
Parcelld # 1608640000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authorIty to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement, the City strongiy urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 1224 W SOUTH PARK AVE
Agent/Owner
OSHKOSH
WI 64902 - 0000
Telephone Number
231-2114
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.i, Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.