Loading...
HomeMy WebLinkAbout0116329-Building (roof) e OSHKOSH ON THE WATER Job Address 646 BOWEN ST CITY OF OSHKOSH No 116329 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS J ROWLAND Create Date 09/16/2005 Designer Contractor OSHKOSH ROOFING & SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----.2 Sq. Ft. Rooms Height 0 Ft. Finished/Living -----.2 Sq. Ft. Bedrooms 0 Stories Garage -----.2 Sq. Ft. Baths 0 0 Projection I Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature SFR/Tear off and replace existing roofing and decking on house: NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: r $10,990.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00 Date 09/16/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcel Id # 1102190000 in the performance of this work I agree to perfonm all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement. the City strongly urges the penmit applicant to contact the easement holder(s) and to sec'1'J ny necessary appro~ before starting such activity. . 1 Æ/ '; t- Signature f L.-- ;) Date ~V- . Úv Agent/Owner Address 2070 OMRO RD OSHKOSH WI 54904 - 0000 Telephone Number 920-231-2060 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.