Loading...
HomeMy WebLinkAbout2005-Building (windows) ~ OSHKOSH ON THE WATER Job Address 251 N WESTFIELD ST CITY OF OSHKOSH No 116309 BUILDING PERMIT - APPLICATION AND RECORD Owner RUSSELL W/DONNA NELSON Create Date 09/15/2005 Designer Contractor PEPPLER REMODELING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit # Dwelling Units ~ # Structures 0 Park Dedication UseJNature SFRIlnstalling 2 replacement windows (same size and location). of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ PJ,... $5,000.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 09/15/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 0612450000 In the performance of this w9'l< I agree to perform all work pursuant to rules governing the described construction. While the City of OShkOS!!,1Í$ no authority to force easement restrictions of which it is not a party, if you perform the work described in this perm~!a'pp . "yon wi hin a e e nt, the City strongly urges the permit applicant to contact the easement . 10 holder(s)andtosecy(e y","s rya ro i~ fore starting such activity. ~.~i Signature ! Dat / ~ AgenUOwner Address W2380 COUNTY Q BERLIN ~ 54923 - 0000 Telephone Number 920-361-7731 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.