Loading...
HomeMy WebLinkAbout0116315-Building (siding) e OSHKOSH ON THE WATER Job Address 1714 WESTERN ST CITY OF OSHKOSH No 116315 BUILDING PERMIT -APPLICATION AND RECORD Owner JEFFREY E/MARIA WilLIAMS Create Date 09/15/2005 Contractor SALZER SIDING Designer Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms 0 Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures ----9. Use/Nature Install vinyl siding on house & garage. Cover overhang in aium. wrap windows in alum. Install 11 replacement (same size & location) of Work ' indows.' NO STRUCTURAL WORK. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: r- $10.700.00 Plan Approval $0.00 Permit Fee Paid $79.00 Park Dedication $0.00 Date 09/15/2005 Final/O.P. OO/o%oao 0 ¡OermitVoided I Parcelld # 1211100000 In the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date AgenUOwner Address PO BOX 825 OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perlormed within two business days from the time the project is ready.