Loading...
HomeMy WebLinkAbout2005-Building (roof) e OSHKOSH ON THE WATER Job Address 1810ROOSEVELTAVE CITY OF OSHKOSH No 116311 BUILDING PERMIT - APPLICATION AND RECORD Owner SPENCERXSMITH Create Date 09/15/2005 Designer Contractor OWNER Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Class of Const: Rooms 0 Height 0 Ft. Bedrooms 0 Stories Baths 0 0 Pier 0 Other 0 Treated Wood Size Zoning Unfinished/Basement ------.2 Sq. Ft. ------.2 Sq. Ft. 0 Projection I Finished/Living Canopies Garage ------.2 Sq. Ft. Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post Occupancy Permit Flood Plain Height Permit Park Dedication # Dwelling Units 0 # Structures 0 Use/Nature ~r / add 1 layer of roofing to the existing 2 layers on house, no structural changes ofWork HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation $800.00 Plan Approval $0.00 Permit Fee Paid $20.00 Park Dedication $0.00 Issued By: ØM Date 09/15/2005 Final/O.P. 00/00/0000 0 Permit Voided I Parcelld # 1212650000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure an ssary approvals before starting such activity. Signature Date "" \ ,'- los Address 2450 HAMILTON ST Agent/Owner OSHKOSH WI 54901 - 0000 Telephone Number O,'t.ö LJzo !:"6""Î To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.