HomeMy WebLinkAbout0116296 B
e
OSHKOSH
ON THE WATER
Job Address 7500LSONAVE
CITY OF OSHKOSH
No
116296
BUILDING PERMIT - APPLICATION AND RECORD
Owner JON RILORI A MORTENSEN
Create Date
09/12/2005
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
-----2 Sq. Ft.
-----2 Sq. Ft.
Rooms
Height 0 Ft.
æ~_e-"tlon I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Garage
-----2 Sq. Ft.
Baths
0
Signs
-----2
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units 0
# Structures
0
Park Dedication
Use/Nature SFRIlnstall vinyl siding on house & garage. . Cover overhang in aluminum & wrap windows. install 9 replacement (same size & location)
of Work indows.' NO STRUCTURAL WORK.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ~
$12,000.00 Plan Approval
$0.00 Permit Fee Paid
$84.00 Park Dedication
$0.00
Date 09/14/2005
Final/O.P. 00/00/0000
0 Permit Voided I
Parcelld # 1252130000
In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described In this penmit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
AgenVOwner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.