Loading...
HomeMy WebLinkAbout0116283-Building (window) e OSHKOSH ON THE WATER Job Address 1857 MCCURDY ST CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116283 Owner ALFRED/JOAN NIMKE JR Create Date 09/14/2005 Designer Contractor BRENNAN-FRASER ROOFING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement -----2 Sq. Ft. Rooms Height 0 Ft. Finished/Living -----2 Sq. Ft. Bedrooms 0 Stories Garage -----2 Sq. Ft. Baths 0 0 Projection I Canopies Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units -------2 # Structures -------2 Use/Nature SFRIRemove exiSti,ïg picture window & replace with Soft-Lite vinyl replacement casement window" NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $1.483.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Date 09/14/2005 Final/O.P, 00/00/0000 0 Penmit Voided I Parcelld # 1408460000 In the perfonmance of this work I agree to perform all work pursuant to rules goveming the described construction, Whiie the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the penmit applicant to contact the easement holder(s) and to secure any necessary approvais before starting such activity. Signature Date Address 415 N PERKINS Agent/Owner APPLETON Wi 54914 - 0000 Telephone Number 739-5559 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.