HomeMy WebLinkAbout0116293-Building (siding)
e
OSHKOSH
ON THE WATER
Job Address 612 DOVE ST
CITY OF OSHKOSH
No
116293
BUILDING PERMIT - APPLICATION AND RECORD
Owner DAVID J SCHROEDER
Create Date
09/12/2005
Designer
Contractor
SALZER SIDING
Category
141-ExteriorRemodelin9
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
J
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
0 Projection I
Finished/Living
Bedrooms 0
Stories
Canopies 0
Signs
Garage
~Sq.Ft.
Baths
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
# Dwelling Units ~
# Structures
0
Park Dedication
Use/Nature Install vinyl siding on house & garage. Cover overhand in aluminum and wrap windows. Install new gutters." NO STRUCTURAL WORK.
of Work
Plumbing Contractor
HVAC Contractor
Electric Contractor
Fees: Valuation
Issued By: Þ
I
$17,000.00 Plan Approval
$0.00 Permit Fee Paid
$109.00 Park Dedication
$0.00
Date 09/1412005
Final/O,P. 00/00/0000
0 Permit Voided I
Parcelld # 1604430000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please cali the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e, Footing, Service, Final, etc.), Access into Building if Secure (how do We gain entry), your Name and Phone
Number. Unless specified otherwise, We will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.