HomeMy WebLinkAbout0116294-Building (siding)
~
OSHKOSH
ON THE WATER
Job Address 1836ARIZONAST
CITY OF OSHKOSH
BUILDING PERMIT - APPLICATION AND RECORD
No
116294
Owner BARBARA TESCH-HABLE
Create Date
09/12/2005
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height 0 Ft.
0 Projection I
Garage
~Sq.Ft.
Baths
0
Canopies 0
Signs
Finished/Living
Bedrooms 0
Stories
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Penmit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature Duplex/Install vinyl siding on house. Cover overhang in aluminum & wrap windows: NO STRUCTURAL WORK.
of Work
~J
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ¡w/"
$8,900.00 Plan Approval
$0.00 Permit Fee Paid
$68.00 Park Dedication
$0.00
Date 09/14/2005
Final/O.P. 00/00/0000
0 Penmit Voided I
Parcelld # 1404930000
In the perfonmance 01 this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions 01 which it is nota party, ilyou perform the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals belore starting such activity.
Signature
Date
Address PO BOX 825
AgenVOwner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (Le. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.