HomeMy WebLinkAbout0116291-Building (siding)
G
OSHKOSH
ON THE WATER
Job Address 160W 19TH AVE
CITY OF OSHKOSH
No
116291
BUILDING PERMIT - APPLICATION AND RECORD
Owner LlNN/CHELLEY BECK
Create Date
09/12/2005
Designer
Contractor
SALZER SIDING
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Unfinished/Basement
~Sq.Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
D Projection I
Finished/Living
Bedrooms
Stories
Canopies 0
Garage
~Sq.Ft.
Baths
0
Signs
~
Foundation
. Poured Concrete 0 Floating Siab
0 Concrete Block 0 Post
0 Pier
0 Treated Wood
0 Other
Occupancy Permit Not Required
Flood Plain
Height Permit
Park Dedication
# Dwelling Units ~
# Structures
0
Use/Nature SFR/Install vinyi siding on house & garage. Overhang, window & door openings wrapped in aluminum' NO STRUCTURAL WORK.
of Work
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ¿
$8,000.00 Plan Approval
$0.00 Permit Fee Paid
$62.00 Park Dedication
$0.00
Date 09/14/2005
Final/O.P. 00/00/0000
D Permit Voided I
Parcelld # 1401850000
In the pertormance of this work I agree to pertonm all work pursuant to rules goveming the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertorm the work
described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 825
Agent/Owner
OSHKOSH
WI 54903 - 0825
Telephone Number
(920) 231-5025
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.