Loading...
HomeMy WebLinkAbout0116291-Building (siding) G OSHKOSH ON THE WATER Job Address 160W 19TH AVE CITY OF OSHKOSH No 116291 BUILDING PERMIT - APPLICATION AND RECORD Owner LlNN/CHELLEY BECK Create Date 09/12/2005 Designer Contractor SALZER SIDING Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection I Finished/Living Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths 0 Signs ~ Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ~ # Structures 0 Use/Nature SFR/Install vinyi siding on house & garage. Overhang, window & door openings wrapped in aluminum' NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ¿ $8,000.00 Plan Approval $0.00 Permit Fee Paid $62.00 Park Dedication $0.00 Date 09/14/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 1401850000 In the pertormance of this work I agree to pertonm all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you pertorm the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 825 Agent/Owner OSHKOSH WI 54903 - 0825 Telephone Number (920) 231-5025 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.