Loading...
HomeMy WebLinkAbout0116246-Building (windows) G OSHKOSH ON THE WATER Job Address 435 W SNELL RD CITY OF OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD No 116246 Owner PAUUDANA BERGER Create Date 09/12/2005 Designer Contractor WINDOW WORLD OF MILWAUKEE Category 141 - Exterior Remodeling Plan Type . Building _0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ~Sq.Ft. Rooms 0 Height 0 Ft. Finished/Living ~Sq.Ft. Bedrooms Stories Garage ~Sq.Ft. Baths 0 0 Projection I Canopies ~ Signs 0 Foundation . Poured Concrete 0 Floating Siab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units -2. # Structures 0 Use/Nature SFRIinstall14 replacement (existing openings) windows" NO STRUCTURAL WORK. of Work HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $4.683.00 Plan Approval $0.00 Permit Fee Paid $44.00 Park Dedication $0.00 Date 09/12/2005 Final/O.P. 00/00/0000 0 Permit Voided I Pareelld # 1251940000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a pany. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 625 FOND DU LAC AVE Agent/Owner FOND DU LAC WI 54935 - 0000 Telephone Number 920-923-4189 To schedule Inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue ifthe inspection is not performed within two business days from the time the project is ready.