Loading...
HomeMy WebLinkAbout0116227-Plumbing (water heater) ~ OSHKOSH ON THE WATER Job Address 1841 MCCURDY ST Contractor WATTERS PLUMBING Bathtub 0 Whirlpool 0 Lavatory 0 Toilet 0 Res. Sink 0 Bar Sink 0 Water Heater 1 Site Drain 0 Roof Drain 0 Misc. 0 Fixtures Shower Floor Drain Lndry Tray Disposal Dishwasher Sump Pump Classrm Sink Breakrm Sink Ejector/Grind Use/Nature of Work rm ;~W,"""~"" CITY OF OSHKOSH No 116227 Owner SHARON C RHODE 0 0 0 0 0 0 0 0 0 WaitSt Ice Chest Exam Sink Sculry Sink Hand Sink Plaster Sink Surgeons Sink F Prep Sink Serv Sink PLUMBING PERMIT - APPLICATION AND RECORD Sanitary Sewer Size Storm Sewer Water Service Create Date 09/12/2005 Category 411 - Residential-Water Heaters 0 0 0 0 0 0 0 0 0 Water Softner Local Waste Clothes Wshr Material Plan 0 Shamp Sink 0 0 FlrlWst Sink 0 0 Catch Basin 0 0 Wash Ftn 0 0 Urinal 0 0 Standp Rec 0 0 Ice Maker 0 0 Gar Drain 0 0 Soda Disp 0 Coffee Maker 0 Int Grease Trap 0 Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Bidet Beer Tap Lab Sink Sterilizer Dip Well Drink Ftn Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Parcelld # 1408440000 Valuation $695.00 Plan Approval $20.00 0 Pennit Voided I Issued By $0.00 Permit Fees Date 09/12/2005 In the performance of this work, I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement, the City strongly urges the pennit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 118 Telephone Number 920-733-8125 Agent/Owner MENASHA WI 54952 - 0118 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not perfonmed within two business days from the time the project is ready.