HomeMy WebLinkAbout2005-Building (roof & siding)
e CITY OF OSHKOSH No 116245
OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD
ON THE WATER
Job Address 1275 MARICOPA DR Owner RONALD P ZIEBELL Create Date 09/12/2005
Designer
Contractor
IMPRESSIVE ROOFING AND SIDING INC
Category
141 - Exterior Remodeling
Plan
Type
. Building
0 Sign
0 Canopy
0 Fence
0 Raze
Zoning
Class of Const:
Size
Finished/Living
~Sq.Ft.
~Sq.Ft.
Rooms
Height
0 Ft.
D Projection 1
UnfinishedlBasement
Bedrooms 0
Stories
Garage
~Sq.Ft.
Baths
Canopies 0
Signs
Foundation
. Poured Concrete 0 Floating Slab
0 Concrete Block 0 Post
0 Pier
0 Treated Weed
0 Other
Occupancy Permit Not Required
Flood Plain -
# Dwelling Units 0
Height Permit
Park Dedication
# Structures
~
UselNature SFRITear off and replace existing reefing on house & garage. Replace existing vinyl siding on house & garage with new vinyl. Replace
of Work utters & downspouts: Electric not applicable - existing J Blocks.
HVAC Contractor
Plumbing Contractor
Electric Contractor
Fees: Valuation
Issued By: ¿
$21.196.47 Plan Approval
$0.00 Permit Fee Paid
$130.00 Park Dedication
$0.00
Date 09/12/2005
FinaIIO.P. 00/00/0000
D Permit Voided I.
Parcelld # 1312670000
In the performance of this work I agree to perform all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parfy. if you perform the work
described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement
holder(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address PO BOX 2786
AgenVOwner
APPLETON
WI 54912 - 2786
Telephone Number
232-1669
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.