Loading...
HomeMy WebLinkAbout2005-Building (roof & siding) e CITY OF OSHKOSH No 116245 OSHKOSH BUILDING PERMIT - APPLICATION AND RECORD ON THE WATER Job Address 1275 MARICOPA DR Owner RONALD P ZIEBELL Create Date 09/12/2005 Designer Contractor IMPRESSIVE ROOFING AND SIDING INC Category 141 - Exterior Remodeling Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Finished/Living ~Sq.Ft. ~Sq.Ft. Rooms Height 0 Ft. D Projection 1 UnfinishedlBasement Bedrooms 0 Stories Garage ~Sq.Ft. Baths Canopies 0 Signs Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Weed 0 Other Occupancy Permit Not Required Flood Plain - # Dwelling Units 0 Height Permit Park Dedication # Structures ~ UselNature SFRITear off and replace existing reefing on house & garage. Replace existing vinyl siding on house & garage with new vinyl. Replace of Work utters & downspouts: Electric not applicable - existing J Blocks. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ¿ $21.196.47 Plan Approval $0.00 Permit Fee Paid $130.00 Park Dedication $0.00 Date 09/12/2005 FinaIIO.P. 00/00/0000 D Permit Voided I. Parcelld # 1312670000 In the performance of this work I agree to perform all work pursuant to rules governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a parfy. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address PO BOX 2786 AgenVOwner APPLETON WI 54912 - 2786 Telephone Number 232-1669 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.