Loading...
HomeMy WebLinkAbout0116238-Building (roof) 0 OSHKOSH ON THE WATER Job Address 1107 HARNEY AVE CITY OF OSHKOSH No 116238 BUILDING PERMIT - APPLICATION AND RECORD Owner COBALT PROPERTY MANAGEMENT LLC Create Date 08/11/2005 Designer Contractor HICKEY ROOFING Category 141 - Exterior Remodeling Plan Type . Buildi"IL..- 0 Sign 0 Canopy 0 Fence 0 Raze -----.J Zoning Class of Const: Size Finished/Living ~Sq.Ft. ~Sq.Ft. Rooms 0 Height 0 Ft. D Projection I Unfinished/Basement Bedrooms Stories Canopies 0 Garage ~Sq.Ft. Baths Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Not Required Flood Plain Height Permit Park Dedication # Dwelling Units ----'J. # Structures ----'J. Use/Nature iSFRI Tear off and replace existing roofin gon house" NO STRUCTURAL WORK. Spencer Smith will have Hickey Roofing within the of Work ~ext 2 weeks repair the roof. 8-11-05. HVAC Contractor Plumbing Contractor Electric Contractor Fees: Valuation Issued By: ~ $3.500.00 Plan Approval $0.00 Permit Fee Paid $38.00 Park Dedication $0.00 Date 09/12/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld # 0805620000 In the performance of this work I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party. if you perform the work described in this permit application within an easement. the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 1427 BROAD ST AgenUOwner OSHKOSH WI 54901 - 0000 Telephone Number 426-4008 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.