Loading...
HomeMy WebLinkAbout0116244-Building (driveway) e OSHKOSH ON THE WATER Job Address 624 SEAGLE ST CITY OF OSHKOSH No 116244 BUILDING PERMIT - APPLICATION AND RECORD Owner THOMAS J LAST Create Date 09/12/2005 Designer Contractor OWNER Category 256 - Parking Lots, Driveways Plan Type . Building 0 Sign 0 Canopy 0 Fence 0 Raze Zoning Class of Const: Size Unfinished/Basement ----.2 Sq. Ft. Rooms Height 0 Ft. Finished/Living ----.2 Sq. Ft. Bedrooms 0 Stories Garage ----.2 Sq. Ft. Baths 0 D Projection I Canopies 0 Signs 0 Foundation . Poured Concrete 0 Floating Slab 0 Concrete Block 0 Post 0 Pier 0 Treated Wood 0 Other Occupancy Permit Flood Plain Height Permit II Dwelling Units ~ II Structures ~ Park Dedication Use/Nature ~FRI Repiacing the exisitng driveway with concrete. The driveway will not be enlarged. Kyle Erdman will be doing the work. ofWork HVAC Contractor Plumbing Contractor Electric Contractor $1,500.00 Plan Approval $0.00 Permit Fee Paid $26.00 Park Dedication $0.00 Fees: Valuation Issued By: cry Date 09/12/2005 Final/O.P. 00/00/0000 D Permit Voided I Parcelld II 0611190000 In the performance of this work I agree to perform all work pursuant to ruies governing the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit application within an easement, the City strongly urges the permit applicant to contact the easement holder(s) and to secure any necessary appro Is before starting such activity. I Date ~ 1/U2 / ðj- Signature Address 624 SEAGLE ST AgenUOwner OSHKOSH Wi 54902 - 5520 Telephone Number To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.