Loading...
HomeMy WebLinkAbout0116243-Plumbing (bathtub) e OSHKOSH ON THE WATER Job Address 1317 CONGRESS AVE CITY OF OSHKOSH No 116243 PLUMBING PERMIT. APPLICATION AND RECORD OWner ROBERT UBRENDA DREXLER Create Date 09/12/2005 Contractor SOPER PLUMBING Category 410 - Residential-Interior Plan Bathtub 1 Shower 0 Water Softner 0 Wait.St. 0 Shamp Sink 0 Whirlpool 0 Floor Drain 0 Local Waste 0 Ice Chest 0 FlrlWst Sink 0 Lavatory 0 Lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 Res. Sink 0 Dishwasher 0 BeerTap 0 Hand Sink 0 Urinal 0 Bar Sink 0 Sump Pump 0 Lab Sink 0 Plaster Sink 0 Standp Rec 0 Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Site Drain 0 Breakrm Sink 0 DipWell 0 F Prep Sink 0 Gar Drain 0 Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0 Misc. 0 Fixtures Use/Nature r" ; ~ ~~"~ of Work Coffee Maker ~ Int Grease Trap ~ Ext Grease Trap ~ RPZ Valve 0 Eye Wash Statn 0 Wtr Sewer Mtrs 0 Deduct Meters 0 Wtr Usage Mtrs 0 Size Material Type # 0 0 0 0 0 0 0 0 0 0 Conn. Type Sanitary Sewer Storm Sewer Water Service Parcelld # 1205190000 Valuation $1,600.00 Plan Approval $0.00 Permit Fees $20.00 D Permit Voided I Issued By Date 09/12/2005 In the performance of this work. I agree to perform all work pursuant to rules goveming the described construction. While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perform the work described in this permit appiication within an easement. the City strongly urges the permit appiicant to contact the easement holder(s) and to secure any necessary approvals before starting such activity. Signature Date Address 2225 BURNWOOD DR Agent/Owner OSHKOSH WI 54902 - 0000 Telephone Number 426-2151 To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may continue if the inspection is not performed within two business days from the time the project is ready.