HomeMy WebLinkAbout0116224-Plumbing (kitchen sink)
~ CITY OF OSHKOSH No 116224
OSHKOSH PLUMBING PERMIT -APPLICATION AND RECORD
ON THE WATER
Job Address 861 ECKARDT CT Owner WilLIAM R WILDE/BARBARA ROHLF Create Date 09/09/2005
Contractor SOPER PLUMBING Category 410 - Residential-Interior Plan
Bathtub 0 Shower 0 WaterSoftner 0 Wait. St. 0 Shamp Sink 0 Coffee Maker 0
Whirlpool 0 Floor Drain 0 local Waste 0 Ice Chest 0 FlrlWst Sink 0 Int Grease Trap 0
lavatory 0 lndry Tray 0 Clothes Wshr 0 Exam Sink 0 Catch Basin 0 Ext Grease Trap 0
Toilet 0 Disposal 0 Bidet 0 Sculry Sink 0 Wash Ftn 0 RPZValve 0
Res. Sink 1 Dishwasher 0 Beer Tap 0 Hand Sink 0 Urinal 0 Eye Wash Statn 0
Bar Sink 0 Sump Pump 0 lab Sink 0 Plaster Sink 0 Standp Rec 0 Wtr Sewer Mtrs 0
Water Heater 0 Classrm Sink 0 Sterilizer 0 Surgeons Sink 0 Ice Maker 0 Deduct Meters 0
Site Drain 0 Breakrm Sink 0 Dip Well 0 F Prep Sink 0 Gar Drain 0 Wtr Usage Mtrs 0
Roof Drain 0 Ejector/Grind 0 Drink Ftn 0 Serv Sink 0 Soda Disp 0
Misc. 0
Fixtures
Use/Nature
of Work
I ".. .,,--,
Size
Material
Conn. Type
Type
#
0
0
0
0
0
0
0
0
0
0
Sanitary Sewer
Storm Sewer
Water Service
Parcelld #
1413000000
$20.00 D Permit Voided I
Valuation
$500.00
Plan Approval
$0.00
Permit Fees
Issued By
Date 09/09/2005
In the perfonnance of this work, I agree to perfonn all work pursuant to rules governing the described construction.
While the City of Oshkosh has no authority to enforce easement restrictions of which it is not a party, if you perfonn the work
described in this pennit application within an easement, the City strongly urges the penni! applicant to contact the
easement hoider(s) and to secure any necessary approvals before starting such activity.
Signature
Date
Address 2225 BURNWOOD DR
AgenUOwner
OSHKOSH
WI 54902 - 0000
Telephone Number 426-2151
To schedule inspections please call the Inspection Request line at 236-5128 noting the Address, Permit Number, Type of
Inspection (i.e. Footing, Service, Final, etc.), Access into Building if Secure (how do we gain entry), your Name and Phone
Number. Unless specified otherwise, we will assume the project is ready at the time the request is received. Work may
continue if the inspection is not performed within two business days from the time the project is ready.